My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 3:18:23 PM
Creation date
12/9/2025 1:50:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 6-7
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1634
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
70-BKR-0002A <br />LS46 SERVICE <br />LS46 FEEDER <br />BREAKERS <br />70-BKR-0002B <br />TIE <br />70-BKR-0002C <br />PORTABLE <br />GENERATOR <br />70-BKR-0003 <br />TIE <br />70-BKR-0001C <br />STANDBY <br />GENERATOR <br />70-BKR-0001B <br />TIE <br />PGSF FEEDER <br />BREAKERS <br />70-BKR-0001A <br />PGSF SERVICE <br />70-SWBD-0002 70-SWBD-0001 <br />SPD <br />HMI AND CONTROL <br />COMPARTMENT <br />PM <br />SPD <br />PM <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />55755JAMESA.TU <br />C <br />KERPLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGEAutodesk Docs://157889 - PGSF/E-3525-70V23.rvt8/6/2025 3:55:09 PMEP-70-4001 <br />444 <br />ELECTRICAL POWER <br />OMES BUILDING SWITCHBOARD ELEVATION <br />C. BJORKLUND <br />S. CANAS <br />J. TUCKER <br />EP-70-2001 SCALE: 3/4" = 1'-0" <br />1 ELEVATION <br />GENERAL NOTES: <br />1. ALL CONDUITS AND CABLES ARE TOP ENTRY. <br />2. REFER TO ONE-LINE DIAGRAMS FOR BREAKER DETAILS. <br />3. DRAWING IS REPRESENTATIVE ONLY. COORDINATE WITH <br />MANUFACTURER THROUGHOUT THE SUBMITTAL <br />PROCESS. <br />09/03/2025 ZB
The URL can be used to link to this page
Your browser does not support the video tag.