Laserfiche WebLink
1 <br />1 2 <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />57595M YOLL Y E. <br />B <br />R <br />APLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />09/03/2025 ZBAutodesk Docs://157889 - PGSF/D-3525-20-25-30V23.rvt8/26/2025 10:18:53 AMD-25-9001 <br />322 <br />PROCESS <br />INFLUENT BUILDING PHOTOS <br />M. BRAY <br />T. LEMON <br />R. LONG <br />KEYNOTES: <br />1 REMOVE AND REPLACE EXISTING FRP FLANGE AS <br />RECOMMENDED BY FRP PIPE MANUFACTURER AND <br />ACCORDING TO SECTION 40 50 36.71 PRIOR TO <br />HYDROSTATIC TESTING. INSTALL TEMPORARY BLIND <br />FLANGE FOR HYDROSTATIC TEST. FOR MATCHING <br />FLANGE, INSTALL STEEL CL 150 4" REDUCING FLANGE, <br />COAT BOTH SIDES WITH LIQUID EPOXY PER PIPING <br />SYSTEM SCHEDULE. MATCH FLANGE BOLT PATTERN OF <br />FRP FLANGE. <br />2 INSTALL STEEL CL 150 BLIND FLANGE ON EXISTING. <br />A PHOTO A B PHOTO B <br />D-25-1001 D-25-1001