My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 3:18:23 PM
Creation date
12/9/2025 1:50:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 6-7
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1634
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
317a319a3 <br />19a <br />3 <br />17a <br />19b17d17c3 <br />17a <br />3 <br />19b <br />317e319cAa <br />Ab <br />Ac <br />Ba <br />Bb <br />Bd <br />87 <br />AL4 <br />36 W 10' - 0" <br />L2 5 <br />E73006 TYP <br />15b13a <br />IL1E <br />38 W 8' - 0" <br />P <br />7 <br />Aa <br />Ab <br />Ac <br />Ba <br />Bb <br />Bd <br />87 <br />205 <br />PROCESS PIPE ROOM 3 <br />204 <br />UNUSED AREA 4 <br />202 <br />UNUSED AREA 2 <br />201 <br />UNUSED AREA 1 <br />IL1 <br />38 W 15' - 0" <br />P1 <br />IL1E <br />38 W 15' - 0" <br />P1 <br />IL1E <br />38 W 10' - 0"OS <br />P1 <br />IL1E <br />38 WOS <br />P1 <br />IL1 <br />38 W 9' - 6" <br />P3 <br />XLE <br />8' - 0" <br />W1 <br />XLE <br />7' - 6" <br />W <br />WL2 <br />53 W 13' - 0" <br />W1 <br />4 <br />19b <br />17d <br />17c <br />17 <br />15 <br />19 <br />15 <br />17a <br />17a <br />19a <br />6 <br />Aa <br />Ab <br />Ac <br />Ba <br />Bb <br />Bc <br />Bd <br />87 <br />Ca <br />102 <br />PROCESS PIPE ROOM 2 <br />101 <br />PROCESS PIPE ROOM 1 <br />100 <br />STAIR 1 <br />WL2 <br />53 WOS <br />W2 <br />AL1E <br />25 WPC <br />W1 <br />AL1E <br />25 WPC <br />W1 <br />XLE <br />7' - 0" <br />W1 <br />XLE <br />7' - 6" <br />W1 <br />IL1 <br />38 W 16' - 0" <br />P2 <br />IL1E <br />38 W 16' - 0" <br />P3 <br />1 <br />2 <br />3 <br />4 <br />17e15 <br />13 <br />19c <br />19c <br />17e <br />17 <br />19 <br />17e <br />19c <br />15 <br />15 <br />13 <br />KEY PLAN <br />SCALE: NTS <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />55755JAMESA.TU <br />C <br />KERPLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />09/03/2025 ZBAutodesk Docs://157889 - PGSF/E-3525-20-25-30V23.rvt8/26/2025 11:29:34 AMEL-25-1001 <br />461 <br />ELECTRICAL LIGHTING <br />INFLUENT BUILDING LIGHTING AND <br />RECEPTACLE PLANS <br />K. MONTPETIT <br />S. CANAS <br />J. TUCKER <br />KEYNOTES: <br />1 WALL MOUNT WL2 LIGHT FIXTURE 8'-0" AFF ON STAIR <br />LANDING. <br />2 WALL MOUNT AL1E LIGHT FIXTURE 8'-0" AFF AT DOOR. <br />3 WALL MOUNT AL1E LIGHT FIXTURE 11'-0" AFF AT DOOR. <br />4 SURFACE MOUNT IL1E LIGHT FIXTURE TO THE CORRIDOR <br />CEILING. <br />5 TWO AL4 STANCHION POLE LIGHTS FED FROM 20-PNL-3000 <br />ON CIRCUIT SHOWN AT LIGHT. MOUNT STANCHION POLE <br />LIGHTS TO ILLUMINATE THE ROOF SEWER DEBRIS REMOVAL <br />AREA BELOW. SEE DRAWING EL-20-1002 FOR LIGHT SWITCH <br />LOCATIONS. <br />6 SECOND SET OF 3 WAY SWITCHES IS LOCATED AT TOP OF <br />STAIR IN DOG HOUSE ON THE ROOF. <br />7 MOUNT LIGHT SWITCHES INSIDE DOG HOUSE DOOR AT TOP <br />OF STAIRS AT 4'-0" AFF. <br />SCALE: 1/8" = 1'-0" <br />INFLUENT BUILDING ROOF PLAN3SCALE: 1/8" = 1'-0" <br />INFLUENT BUILDING UPPER PLAN2SCALE: 1/8" = 1'-0" <br />INFLUENT BUILDING LOWER PLAN1 <br />GENERAL NOTES: <br />1. LIGHTING IS FED FROM PANEL 25-PNL-3001 ON CIRCUIT <br />SHOWN AT LIGHT, UON. SEE 1 / EP-25-1001 FOR PANEL <br />LOCATION AND EP-25-7001 FOR PANEL SCHEDULE. <br />2. RECEPTACLE(S) ARE FED FROM PANEL 25-PNL-3001 ON <br />CIRCUIT SHOWN AT RECEPTACLE. SEE 1 / EP-25-1001 FOR <br />PANEL LOCATION AND EP-25-7001 FOR PANEL SCHEDULE. <br />3. REUSE EXISTING LIGHTING CONDUITS, CONDUIT <br />SUPPORTS, AND PENETRATIONS WHERE PRACTICAL. <br />DEMOLISH REMAINING EXISTING CONDUITS.
The URL can be used to link to this page
Your browser does not support the video tag.