My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 3:18:23 PM
Creation date
12/9/2025 1:50:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 6-7
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1634
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
GFWP19a 17aABCDE43211417a19a17a19aAL1E25 W10' - 6"W4AL436 W10' - 0"L217a2E73006TYPKEY PLANSCALE: NTSEALNIONG <br />TRSR FO ESPSTA EREERSGEITEGIDNT NO <br />EHOFWASNI55755JAMESA.TUCK E R <br />PLANS ISSUED FORBIDACTIONDATEAPRVD ACTION DATE APRVD ACTION DATE APRVDCONSTRECORDDrawingSheet No.Of TotalDesignedDrawnCheckedDesign Review Level500Plot dateFilepath\FilenameWO# UP-3525PORT GARDNEReverettwa.gov3200 Cedar StreetEverett, WA 98201425.257.8800NO. DATE APRVDREVISION12/2/2024ZBSTORAGE FACILITY -FACILITY CONSTRUCTION PACKAGE09/03/2025 ZBAutodesk Docs://157889 - PGSF/E-3525-40V23.rvt8/26/2025 11:57:26 AMEL-40-1001464ELECTRICAL LIGHTINGSTORMWATER DIVERSION AND TREATMENTLIGHTING AND RECEPTACLE PLANK. MONTPETITS. CANASJ. TUCKERSCALE: 1/8" = 1'-0"PLANGENERAL NOTES:1. LIGHTING IS FED FROM PANEL 60-PNL-3001. SEE EP-60-1001 FOR PANEL LOCATION AND EP-60-7001 FOR PANEL SCHEDULE.2. RECEPTACLE IS FED FROM PANEL 60-PNL-3001. SEE EP-60-1001 FOR PANEL LOCATION AND EP-60-7001 FOR PANEL SCHEDULE.KEYNOTES:1 PROVIDE "WHILE IN USE" TYPE WEATHERPROOF COVER.2 MOUNT LIGHT SWITCHES ON STAND AT THE BOTTOM OFTHE STAIRS.
The URL can be used to link to this page
Your browser does not support the video tag.