My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 3:18:23 PM
Creation date
12/9/2025 1:50:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 6-7
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1634
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
IL2 <br />45 W <br />S6 <br />1 <br />A CB <br />1 <br />3 <br />2 <br />4 <br />IL2 <br />45 W <br />S1 <br />2 <br />3 <br />13a 15a <br />13a15a <br />13a 15a <br />13a <br />3 <br />XLE <br />7' - 6" <br />W <br />21 <br />3 <br />KEY PLAN <br />SCALE: NTS <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />55755JAMESA.TU <br />C <br />KERPLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />09/03/2025 ZBAutodesk Docs://157889 - PGSF/E-3525-60V23.rvt8/26/2025 12:15:50 PMEL-60-1001 <br />468 <br />ELECTRICAL LIGHTING <br />EFFLUENT PUMP STATION LIGHTING AND <br />RECEPTACLE PLAN <br />C. BJORKLUND <br />S. CANAS <br />J. TUCKER <br />SCALE: 1/4" = 1'-0" <br />EFFLUENT PUMP STATION UPPER PLAN <br />GENERAL NOTES: <br />1. LIGHTING IS FED FROM PANEL 60-PNL-3001 ON CIRCUIT <br />SHOWN AT LIGHT. SEE 2 / EP-60-1001 FOR PANEL <br />LOCATION AND EP-60-7001 FOR PANEL SCHEDULE. <br />2. RECEPTACLES ARE FED FROM PANEL 60-PNL-3001 ON <br />CIRCUIT SHOWN AT RECEPTACLE. SEE 2 / EP-60-1001 FOR <br />PANEL LOCATION AND EP-60-7001 FOR PANEL SCHEDULE. <br />3. SEE DRAWING G-60-0002 FOR HAZARDOUS AREA <br />BOUNDARIES. EQUIPMENT MUST BE RATED FOR THE <br />HAZARDOUS AREA IT IS LOCATED IN. <br />KEYNOTES: <br />PROVIDE "WHILE IN USE" TYPE WEATHERPROOF COVER. <br />1 PROVIDE "WHILE IN USE" TYPE WEATHERPROOF COVER. <br />2 MOUNT LIGHT FIXTURES AS HIGH AS POSSIBLE TO THE <br />UNDERSIDE OF THE SLANTED ROOF TO PREVENT BIRD <br />ROOSTING. <br />3 MOUNT LIGHT FIXTURE ABOVE BRIDGE CRANE RAILS TO <br />AVOID CONFLICT WITH CRANE OPERATION.
The URL can be used to link to this page
Your browser does not support the video tag.