Laserfiche WebLink
33b35b3 <br />3b <br />3 <br />5b <br />1 <br />2 <br />3 <br />A B C D E F G <br />IL2E <br />45 W 24' - 6" <br />P5 <br />IL2 <br />45 W 24' - 6" <br />P11 <br />IL1 <br />31 W 13' - 0" <br />P12 <br />IL1E <br />31 W 13' - 0" <br />P4 <br />104 <br />MAINTENANCE BAY <br />111 <br />EQUIPMENT PLATFORM & STORAGE <br />112 <br />EQUIPMENT PLATFORM <br />IL1E <br />31 W 7' - 6" <br />P3 <br />IL1 <br />31 W 7' - 6" <br />P9 <br />1 <br />1 <br />2 <br />2 <br />3 <br />3 <br />E73006 TYP <br />E71003 TYP <br />AL1E <br />25 WPC <br />W1 <br />4AL4 <br />43 W 10' - 0"PC <br />L2 <br />XLE <br />5' - 0" <br />W1 <br />9a <br />7a <br />9a <br />7a 9a <br />7a <br />9a <br />7a 9a <br />7a <br />9a <br />7a 9a <br />7a <br />9a <br />7a 9a <br />7a <br />9a <br />7a 9a <br />7a <br />9a <br />7a <br />8 <br />8 <br />10 <br />5 <br />10 <br />10 <br />8 <br />3b <br />5b <br />3b <br />5b 3b <br />5b <br />3b <br />5b <br />5 3 <br />16 <br />18 <br />18 <br />9a <br />7a <br />9a <br />7a <br />9a <br />7a <br />9a <br />7a <br />3b <br />5b <br />3b <br />5b <br />KEY PLAN <br />SCALE: NTS <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />55755JAMESA.TU <br />C <br />KERPLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />09/03/2025 ZBAutodesk Docs://157889 - PGSF/E-3525-70V23.rvt8/26/2025 12:23:51 PMEL-70-1002 <br />470 <br />ELECTRICAL LIGHTING <br />OMES BUILDING SECOND FLOOR LIGHTING <br />AND RECEPTACLE PLAN <br />K. MONTPETIT <br />S. CANAS <br />J. TUCKER <br />SCALE: 3/16" = 1'-0" <br />PLAN <br />KEYNOTES: <br />1 MOUNTING HEIGHT IS MEASURED FROM THE FIRST FLOOR <br />FINISHED ELEVATION. <br />2 MOUNTING HEIGHT IS MEASURED FROM THE MEZZANINE <br />PLATFORM FINISHED ELEVATION. <br />3 MOUNTING HEIGHT IS MEASURED FROM THE SECOND <br />FLOOR FINISHED ELEVATION. <br />4 MOUNT AL1E LIGHT AHAP ON EXTERIOR WALL NEXT TO <br />DOOR AS SHOWN. <br />5 MOUNT LIGHT SWITCHES 4'-0" ABOVE DOOR ENTRY <br />THRESHOLD. <br />1. MAINTENANCE BAY (104), EQUIPMENT PLATFORM (111), AND <br />EQUIPMENT PLATFORM (113) ARE OPEN TO STRUCTURE <br />ABOVE. <br />2. ALL LIGHTING IS FED FROM PANEL 70-PNL-3001 ON CIRCUIT <br />SHOWN AT LIGHT FIXTURE. SEE EP-70-2001 FOR PANEL <br />LOCATION AND EP-70-7001 FOR PANEL SCHEDULE. <br />3. RECEPTACLES ARE FED FROM PANEL 70-PNL-3001 ON CIRCUIT <br />SHOWN AT RECEPTACLE, UON. SEE EP-70-2001 FOR PANEL <br />LOCATION AND EP-70-7001 FOR PANEL SCHEDULE. <br />GENERAL NOTES: