Laserfiche WebLink
G GGGGGGGGG <br />GGGGGGGGGGGG GGGGGGGGG GGGGGGGGGGGA CB <br />1 <br />3 <br />2 <br />4 <br />E39003 <br />E31002 <br />E32003 <br />E31003 <br />E31001 <br />CTS018 <br />BOT: 3' - 10" <br />CTS019 <br />BOT: 3' - 10" <br />CTC018 <br />BOT: 2' - 9" <br />CTP1018 <br />BOT: 1' - 7" <br />CTC019 <br />BOT: 2' - 9" <br />CTP1019 <br />BOT: 1' - 7" <br />E320071 <br />E31003 <br />DB0006B <br />SEE DRAWING E-00-2001 <br />FOR CONTINUATION <br />SEE DRAWING E-00-2001 <br />FOR CONTINUATION <br />DB0007 <br />E31002 <br />KEY PLAN <br />SCALE: NTS <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />55755JAMESA.TU <br />C <br />KERPLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />09/03/2025 ZBAutodesk Docs://157889 - PGSF/E-3525-60V23.rvt8/26/2025 12:15:56 PMEG-60-1001 <br />481 <br />ELECTRICAL GROUNDING <br />EFFLUENT PUMP STATION CABLE TRAY AND <br />GROUNDING PLAN <br />C. BJORKLUND <br />S. CANAS <br />J. TUCKER <br />SCALE: 1/4" = 1'-0" <br />EFFLUENT PUMP STATION UPPER PLAN <br />GENERAL NOTES: <br />1. CABLE TRAY BOTTOM HEIGHTS ARE MEASURED FROM <br />APPROXIMATE GRADE OF 14'-0" EL. <br />KEYNOTES: <br />1 GROUNDING OF CABLE TRAY SYSTEM IS TO FOLLOW NEC IN <br />REGARDS TO NUMBER OF BONDING POINTS AND SPACING <br />OF BONDING POINTS.