My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 3:18:23 PM
Creation date
12/9/2025 1:50:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 6-7
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1634
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
5 <br />30-G-0401 30-G-0101 <br />3" 2W <br />3" 2W <br />4 <br />INV EL 31.08'31.08' <br />INV EL 30.45'INV EL 30.45' <br />T/PRIMARY STORAGE WALKWAY <br />EL 33.78' <br />5 <br />5 6 <br />30-G-0501 30-G-0201 <br />3" 2W 3" 2W <br />4 <br />INV EL 31.08'INV EL 31.08' <br />INV EL 30.45'INV EL 30.45' <br />T/PRIMARY STORAGE WALKWAY <br />EL 33.78' <br />5 6 <br />30-G-0601 <br />30-G-0603 <br />CELL 6 DRAINAGE <br />SLIDE GATE <br />30-G-0303 <br />CELL 3 DRAINAGE <br />SLIDE GATE <br />30-G-0301 <br />3" 2W 3" 2W <br />4 <br />D-30-3003 <br />4 <br />INV EL 31.08' <br />INV EL 31.08' <br />INV EL 30.45' <br />INV EL 30.45' <br />T/PRIMARY STORAGE WALKWAY <br />EL 33.78' <br />5 <br />30-G-0303 <br />CELL 3 DRAINAGE <br />SLIDE GATE <br />1 <br />2 <br />3 <br />4 <br />T/PRIMARY STORAGE WALKWAY <br />EL 33.78' <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />57595M YOLL Y E. <br />B <br />R <br />APLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />09/03/2025 ZBAutodesk Docs://157889 - PGSF/D-3525-20-25-30V23.rvt8/26/2025 10:19:19 AMD-30-3003 <br />337 <br />PROCESS <br />PRIMARY COMBINED SEWER STORAGE <br />SECTIONS AND DETAILS 2 <br />M. BRAY <br />T. LEMON <br />R. LONG <br />GENERAL NOTES: <br />D-30-2003 SCALE: 1/8" = 1'-0" <br />1 PRIMARY STORAGE CELLS 1 & 4 <br />SCALE: 1/8" = 1'-0" <br />2 PRIMARY STORAGE CELLS 2 & 5 <br />D-30-2001 SCALE: 1/8" = 1'-0" <br />3 PRIMARY STORAGE CELLS 3 & 6 <br />1. PROVIDE PROFESSIONAL ENGINEERING SERVICES FOR <br />DESIGN OF ALL PIPE SUPPORTS PER SECTION 40 05 01. ANT <br />PIPE SUPPORTS SHOWN ON THE DRAWINGS ARE <br />CONCEPTUAL ONLY. <br />KEYNOTES: <br />1 EMBED GATE SILL IN CHANNEL. GATE MUST BE FLUSH <br />WITH CHANNEL. SEE STRUCTURAL DRAWINGS. <br />2 MOUNT GATE FRAME AS INDICATED ON DETAIL <br />A/S-30-3012 <br />3 WALL MOUNT PORTION OF GATE FRAME BEYOND THE <br />STRUCTURAL CHANNEL. <br />4 EMBED GATE FRAME INTO STRUCTURAL CHANNEL <br />MOUNT GATE FRAME AS INDICATED ON DETAIL <br />A/S-30-3012. <br />5 FLUSHING SUMP FILL WATER PER DETAIL 5/D-30-3004. <br />TYPICAL SIX INSTANCES THIS SHEET. <br />D-30-3003 SCALE: 3/8" = 1'-0" <br />4 30-G-0303 AND 30-G-0603 TYPICAL INSTALLATION SECTION
The URL can be used to link to this page
Your browser does not support the video tag.