My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 3:18:23 PM
Creation date
12/9/2025 1:50:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 6-7
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1634
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1 <br />D-40-3002 <br />1 <br />D-40-3001 <br />18" SW <br />18" SW <br />SEE DRAWING D-40-1002 <br />FOR CONTINUATION <br />48" SW <br />MATCHLINESEE DWG 1 / D-40-100340-VLV-0007 <br />STAIRWAYS, SEE STRUCTURAL <br />1 <br />1 <br />2 <br />3D3103 <br />0004 <br />FE/FIT <br />40-XV-0001 <br />40-XV-0002 <br />6" SW <br />6" SW <br />40-CV-0003 <br />4 <br />5 <br />48" SW <br />D12003 <br />6 <br />6 <br />D13006 <br />SEE SHEET C-10-1202 <br />FOR CONTINUATION <br />TEE TO CONNECT <br />DRAIN FROM FORMER <br />FLOAT PIT <br />CONNECT EXISTING 6" <br />DIP TO NEW 6" PVC <br />40-AVV-0008 7 <br />3" SW <br />8 <br />9 <br />10 <br />D13006 <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />24128JOHNP.RIE <br />GELKEY PLAN <br />SCALE: NTS <br />PLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />09/03/2025 ZBAutodesk Docs://157889 - PGSF/D-3525-40V23.rvt8/26/2025 10:52:58 AMD-40-1001 <br />346 <br />PROCESS <br />DIVERSION STRUCTURE VAULT PLAN 1 <br />J. RIEGEL <br />T. LEMON <br />M. BRAY <br />SCALE: 1/4" = 1'-0" <br />DIVERSION STRUCTURE PLAN 1 <br />KEYNOTES: <br />1 SLEEVED FLANGED COUPLING ADAPTER PER 40 05 06. <br />2 DISMANTLING JOINT PER 40 05 06. <br />3 PIPE MATERIAL TRANSITION. FROM OUTDOOR TO BURIED <br />PER 40 05 02.43 <br />4 3" FLANGED PLUG VALVE WITH LEVER OPERATOR PER 40 <br />05 62.01. <br />5 NOT USED <br />6 DIP TO STEEL MATERIALS TRANSITION. <br />7 AVV PER 40 05 79.23. <br />8 EXISTING STRUCTURE FOUNDATION WALLS AND FLOOR <br />TO REMAIN. CONTRACTOR SHALL PRESSURE WASH ALL <br />INTERIOR AND EXTERIOR SURFACES PRIOR TO <br />INSTALLATION OF PIPING AND STAIRWAYS. <br />9 PIPE SUPPORTS SPECIFIED ON STRUCTURAL DRAWINGS. <br />10 BURIED PIPING BETWEEN AREA 40 AND AREA 35 IS STEEL <br />PER C-10-1306 AND 40 05 24. <br />1 09/03/25 C. GISH CONFORMED DRAWING PER ADDENDA NO. 5 AND NO. 6
The URL can be used to link to this page
Your browser does not support the video tag.