My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 3:18:23 PM
Creation date
12/9/2025 1:50:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 6-7
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1634
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
4 46-ST-0130 <br />16" CS <br />46-VLV-0131 <br />1 <br />5 <br />62 <br />46-VLV-0132 <br />0130 <br />PI <br />EL 16.33' <br />EL 28.33' <br />CL EL 18.04' <br />1 <br />2 <br />346-ST-0230 <br />0230 <br />PI <br />46-VLV-0231 5 <br />16" CS <br />6 <br />46-VLV-0232 <br />EL 28.33' <br />EL 16.33' <br />CL EL 18.04' <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />20100345CASEYCHARLE <br />S <br />GISHPLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />09/03/2025 ZBAutodesk Docs://157889 - PGSF/D-3525-46V23.rvt8/26/2025 11:04:17 AMD-46-3002 <br />355 <br />PROCESS <br />LIFT STATION 46 SECTIONS 2 <br />C. GISH <br />T. LEMON <br />R. LONG <br />D-46-1001 SCALE: 1/2" = 1'-0" <br />4 DIRECT FLOW PUMP SURGE TANK <br />D-46-1001 SCALE: 1/2" = 1'-0" <br />5 INDIRECT FLOW PUMP SURGE TANK <br />KEYNOTES: <br />1 DISMANTLING JOINT PER 40 05 06. <br />2 FOR CONTINUATION, SEE SHEET C-10-1304. <br />3 DIPPING TUBE STYLE SURGE TANK PER 43 16 23.03. <br />4 BLADDER STYLE SURGE TANK PER SECTION 43 16 23.02. <br />5 3" BALL VALVE VALVE PER 40 05 63.01. <br />6 TRANSITION TO HDPE PIPE BELOW GRADE.
The URL can be used to link to this page
Your browser does not support the video tag.