Laserfiche WebLink
1 <br />D-70-3001 <br />70-HPU-5000 <br />FLUSHING GATE <br />HYDRAULIC POWER <br />UNIT <br />A B C D E F G <br />1 <br />2 <br />3 <br />104 <br />MAINTENANCE BAY <br />111 <br />EQUIPMENT PLATFORM & STORAGE <br />112 <br />EQUIPMENT PLATFORM <br />1 <br />EXISTING BRIDGE CRANE <br />0001 <br />TSH <br />0001 <br />LI <br />0001 <br />PSL <br />0001 <br />P1 <br />0001 <br />LSL <br />0001 <br />TI <br />D01006 <br />2 <br />KEY PLAN <br />SCALE: NTS <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />57595M YOLL Y E. <br />B <br />R <br />APLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />09/03/2025 ZBAutodesk Docs://157889 - PGSF/D-3525-70V23.rvt8/26/2025 11:16:18 AMD-70-1001 <br />368 <br />PROCESS <br />OMES BUILDING EQUIPMENT PLAN <br />M. BRAY <br />T. LEMON <br />R. LONG <br />KEYNOTES: <br />1 1 SST TUBING TO FLUSHING GATES PER 46 46 61. FIELD <br />ROUTE AS REQUIRED AND RECOMMENDED BY FLUSHING <br />GATE MANUFACTURER. <br />2 HYDRAULIC POWER UNIT PER 46 46 61. <br />INSTRUMENTATION IS PART OF FLUSHING GATE VENDOR <br />PACKAGE. <br />SCALE: 3/16" = 1'-0" <br />MEZZANINE