My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 3:18:23 PM
Creation date
12/9/2025 1:50:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 6-7
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1634
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1 <br />D-70-3001 <br />70-HPU-5000 <br />FLUSHING GATE <br />HYDRAULIC POWER <br />UNIT <br />A B C D E F G <br />1 <br />2 <br />3 <br />104 <br />MAINTENANCE BAY <br />111 <br />EQUIPMENT PLATFORM & STORAGE <br />112 <br />EQUIPMENT PLATFORM <br />1 <br />EXISTING BRIDGE CRANE <br />0001 <br />TSH <br />0001 <br />LI <br />0001 <br />PSL <br />0001 <br />P1 <br />0001 <br />LSL <br />0001 <br />TI <br />D01006 <br />2 <br />KEY PLAN <br />SCALE: NTS <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />57595M YOLL Y E. <br />B <br />R <br />APLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />09/03/2025 ZBAutodesk Docs://157889 - PGSF/D-3525-70V23.rvt8/26/2025 11:16:18 AMD-70-1001 <br />368 <br />PROCESS <br />OMES BUILDING EQUIPMENT PLAN <br />M. BRAY <br />T. LEMON <br />R. LONG <br />KEYNOTES: <br />1 1 SST TUBING TO FLUSHING GATES PER 46 46 61. FIELD <br />ROUTE AS REQUIRED AND RECOMMENDED BY FLUSHING <br />GATE MANUFACTURER. <br />2 HYDRAULIC POWER UNIT PER 46 46 61. <br />INSTRUMENTATION IS PART OF FLUSHING GATE VENDOR <br />PACKAGE. <br />SCALE: 3/16" = 1'-0" <br />MEZZANINE
The URL can be used to link to this page
Your browser does not support the video tag.