My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 3:18:23 PM
Creation date
12/9/2025 1:50:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 6-7
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1634
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
T/EXIST SLAB <br />EL16' - 9 3/8" <br />2 <br />10 EA <br />70-ERV-0101 <br />AIR EXCHANGER <br />105 <br />STORAGE ROOM <br />110 <br />HALLWAY <br />103 <br />LOCKER ROOM <br />6 EA 6 SA <br />6 SA <br />10 EA <br />70-AH-0101 <br />AIR HANDLER <br />BEHIND 10" DUCT <br />MEZZANINE <br />EL28' - 3 3/8" <br />T/EXIST SLAB <br />EL16' - 9 3/8" <br />123 <br />6 SA 6 RA 6 EA <br />101 <br />SHOWER / RESTROOM <br />110 <br />HALLWAY <br />106 <br />BREAK ROOM <br />ROOF <br />EL41' - 6 3/8" <br />SECOND FLOOR PLAN <br />EL35' - 3 3/8" <br />MEZZANINE <br />EL28' - 3 3/8" <br />T/EXIST SLAB <br />EL16' - 9 3/8" <br />70-UH-0108 <br />ELECTRIC UNIT <br />HEATER <br />70-UH-0105 <br />ELECTRIC UNIT <br />HEATER <br />70-UH-0104 <br />ELECTRIC UNIT <br />HEATER <br />70-UH-0101 <br />ELECTRIC UNIT <br />HEATER <br />10 EA <br />109 <br />ELECTRICAL ROOM <br />111 <br />EQUIPMENT PLATFORM & STORAGE <br />104 <br />MAINTENANCE BAY <br />6 EA <br />103 <br />LOCKER ROOM <br />102 <br />JANITOR ROOM <br />101 <br />SHOWER / RESTROOM <br />100 <br />MUD ROOM <br />112 <br />EQUIPMENT PLATFORM <br />6 SA <br />6 RA <br />MEZZANINE <br />EL28' - 3 3/8" <br />T/EXIST SLAB <br />EL16' - 9 3/8" <br />6 SA8 SA6 SA <br />110 <br />HALLWAY <br />104 <br />MAINTENANCE BAY <br />111 <br />EQUIPMENT PLATFORM & STORAGE <br />109 <br />ELECTRICAL ROOM <br />10 EA6 SA 8 SA <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />C49625ARTERBIESE <br />M <br />EEYRPLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />09/03/2025 ZBAutodesk Docs://157889 - PGSF/M-3525-70V23.rvt8/27/2025 8:24:05 AMM-70-3002 <br />376 <br />MECHANICAL <br />OMES BUILDING SECTIONS 2 <br />C. BIESEMEYER <br />M. FULK <br />R. LONG <br />M-70-1001 SCALE: 3/16" = 1'-0" <br />1 SECTION <br />M-70-1001 SCALE: 3/16" = 1'-0" <br />2 SECTION <br />M-70-1001 SCALE: 3/16" = 1'-0" <br />3 SECTION <br />M-70-1001 SCALE: 3/16" = 1'-0" <br />4 SECTION <br />GENERAL NOTES: <br />1. SEE PLANS FOR SUPPLY, RETURN, AND EXHAUST REGISTER <br />INFORMATION.
The URL can be used to link to this page
Your browser does not support the video tag.