My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 3:18:23 PM
Creation date
12/9/2025 1:50:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 6-7
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1634
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
MATCHLINE <br />SEE DRAWING 1 / E-00-2003 <br />DB0001B <br />DB0004B <br />DB0001A <br />MH0101 <br />4 <br />EP-10-3001 <br />AREA 46 -LIFT <br />STATION 46 <br />FENCE LINE <br />EP-46-1002 <br />1 <br />EG-46-1002 <br />1 <br />EC-10-2001 <br />1 <br />EC-10-2001 <br />2 <br />E13003 1 <br />1 <br />EP-46-1001 <br />1 <br />EC-46-1001 <br />1 <br />EL-46-1001 <br />1 <br />EG-46-1001 <br />2 <br />EP-46-1001 <br />2 <br />EG-46-1001 <br />2 <br />3EP-10-2005 <br />4 <br />BACKFLOW <br />PREVENTER <br />STRUCTURE <br />EP-10-2005 <br />3 <br />VENDOR PANEL/CONTROLS <br />FOR STORMWATER <br />PUMPING STATION <br />DB0004A <br />5 <br />5 <br />6 <br />6 <br />6 <br />6 <br />DB0010 <br />PROPERTY LINE <br />KEY PLAN <br />SCALE: NTS <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />55755JAMESA.TU <br />C <br />KERPLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />09/03/2025 ZBAutodesk Docs://157889 - PGSF/E-3525-10V23.rvt8/26/2025 11:12:54 AME-00-2004 <br />391 <br />ELECTRICAL <br />SITE ELECTRICAL ENLARGED PLAN 4 <br />K. MONTPETIT <br />S. CANAS <br />J. TUCKER <br />SCALE: 1" = 10'-0" <br />PLAN <br />KEYNOTES: <br />1 LIFT STATION 46 INDIRECT PUMP FLOWMETER VAULT. <br />2 LIFT STATION 46 DIRECT PUMP FLOWMETER VAULT. <br />3 STORMWATER ISOLATION VAULT. <br />5 AT MH0101 CABLES FROM DB0001A MUST CROSS MANHOLE <br />DIAGONALLY TO CONTINUE INTO DB0001B. CABLES FROM <br />DB0004A MUST CROSS MANHOLE DIAGONALLY TO <br />CONTINUE INTO DB0004B. <br />6 CIRCUITS GOING OUT TO THE BACK FLOW PREVENTER <br />LEAVE AREA 46 THROUGH DB0004B, THROUGH MH0101, INTO <br />DB0001B, THEN CIRCUITS BRANCH OFF DB0001B INTO <br />DB0010 TO THE BACK FLOW PREVENTER STRUCTURE.
The URL can be used to link to this page
Your browser does not support the video tag.