Laserfiche WebLink
PAGE 9 OF 29 <br />PAGE 10 OF 29 <br />PAGE 11 OF 29 <br />PAGE 12 OF 29 <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />WO# UP-3525 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />500RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PATH/FILENAME: C:\Users\scanas\DC\ACCDocs\BC ACC Project Hub\97190 - Port Gardener Wet Weather Design\Project Files\300 Design\CAD\011 E\Sheets\3525-E-10-7203.dwgLAST UPDATE: August 26, 2025 @ 10:09:57 amPLOT DATE: August 26, 2025 @ 10:10:11 am12/2/2024 ZB 09/03/2025 ZB <br /> <br /> <br /> <br />CONFORMED DRAWING PER ADDENDUM NO. 409/03/251 <br />ELECTRICAL <br />CABLE TRAY-RACEWAY <br />SCHEDULE 3 <br />E-10-7203 <br />397 <br /> <br />K. MONTPETIT <br />S. CANAS <br />J. TUCKER <br />55755 <br />C. GISH