My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Addendum 1 Page 2 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />willfully violated, as defined in RCW 49.48.082, any provision of chapter <br />49.46, 49.48, or 49.52 RCW. <br />B. Apprentice Utilization: The following Supplemental Bidder Responsibility <br />Criterion applies to this Project if this Project has apprentice utilization <br />requirements: <br />Certification of Apprentice Compliance. For each public project completed by <br />Bidder during the two-year period immediately preceding the date of the bid <br />solicitation, Bidder must not have been subject to a final determination by the <br />awarding agency that Bidder failed, without good faith efforts approved by the <br />awarding agency, to meet applicable project apprentice utilization <br />requirements. If the Project has apprentice utilization requirements, the <br />Bidder by submitting a Bid certifies that it has not been subject to such a final <br />determination. <br />C. Procedures for Wage Compliance and Apprentice Utilization Criteria: The <br />Bidder must sign and submit certifications as provided by the City in the <br />bidding documents (which are usually included in the Bid Form) before <br />Project award. The City may also use independent sources of information <br />that may be available to demonstrate whether the Bidder is in compliance <br />with these criteria. A Bidder may request that City modify the supplemental <br />bidder responsibility criteria listed above. This request must be in writing to <br />the City project manager and must be received by the City project manager <br />at least ten business days before the bid opening. If City Project staff <br />determines to recommend that the City should find that the Bidder does not <br />meet the bidder responsibility above and is therefore not a responsible <br />bidder, the City Project staff will notify the Bidder in writing with the reasons <br />for its recommendation. If the Bidder disagrees with this recommendation, <br />the Bidder may appeal to the director of the City department responsible for <br />this Contract (the “Director”) by presenting additional information to the <br />Director in writing within two (2) business days after receipt of the <br />recommendation. The Director will consider the appeal and any additional <br />information and will issue a decision regarding the appeal, which will take <br />the form of a recommendation to the Everett City Council. Any protest by <br />Bidder of the Director decision must be in strict conformity to Everett <br />Municipal Code Chapter 3.46, Bid Protest Procedures. <br />D. Additional Supplemental Responsibility Criteria: If this Project is subject to <br />additional supplemental bidder responsibility criteria, then such criteria will <br />be contained in SECTION 00 22 13, SUPPLEMENTAL INSTRUCTIONS TO <br />BIDDERS and such SECTION 00 22 13 will govern those criteria. If there is <br />no SECTION 00 22 13, SUPPLEMENTAL INSTRUCTIONS TO BIDDERS <br />in the bid package, then the Project is not subject to any additional <br />supplemental bidder responsibility criteria.”
The URL can be used to link to this page
Your browser does not support the video tag.