Laserfiche WebLink
City of Everett 00 41 13 - 2 <br />Port Gardner Storage Facility - Facility Construction Package WO# UP-3525 <br /> <br /> <br /> <br /> <br />00 41 13 - 2 BID FORM <br />ITEM <br />NO. DESCRIPTION UNIT <br />ESTIMATED <br />QUANTITY <br />UNIT <br />PRICE <br />CONTRAC <br />T PRICE <br />1. Mobilization and <br />Demobilization a <br />Lump <br />Sum 1 N/A $_______.__ <br />_ <br />2. Temporary erosion and <br />sediment control <br />Lump <br />Sum 1 N/A $_______.__ <br />_ <br />3. Buttress Wall Ground <br />Improvement <br />Lump <br />Sum 1 N/A $_______.__ <br />_ <br />4. <br />Hazardous waste <br />materials removal and <br />disposal <br />Lump <br />Sum 1 N/A $_______.__ <br />_ <br />5. Contaminated soil <br />removal and disposal Ton 1,090 $_____.___ $_______.__ <br />_ <br />6. <br />Grading, Paving, <br />Fencing, and General <br />Site Improvements Area <br />10 <br />Lump <br />Sum 1 N/A $_______.__ <br />_ <br />7. Combined sewer <br />conveyance Area 10 <br />Lump <br />Sum 1 N/A $_______.__ <br />_ <br />8. <br />Combined sewer influent, <br />screening, and storage <br />Areas 15, 20, 25 and 30 <br />Lump <br />Sum 1 N/A $_______.__ <br />_ <br />9. Stormwater conveyance <br />Area 10 b <br />Lump <br />Sum 1 N/A $_______.__ <br />_ <br />10. <br />Stormwater diversion and <br />treatment Area 40 and <br />stormwater equalization <br />Area 35 b <br />Lump <br />Sum 1 N/A $_______.__ <br />_ <br />11. Stormwater Treatment <br />Equipment Area 40 b <br />Lump <br />Sum <br />Equipment for <br />2 of the 8 cells <br />$_______.__ <br />_ <br />$_______.__ <br />_ <br />12. <br />Stormwater and <br />combined sewer storage <br />facility Areas 50 and 55 b <br />Lump <br />Sum 1 N/A $_______.__ <br />_ <br />13. Effluent Pump Station <br />Area 60 b <br />Lump <br />Sum 1 N/A $_______.__ <br />_ <br />14. Site Stormwater Pump <br />Station b <br />Lump <br />Sum 1 N/A $_______.__ <br />_ <br />15. Lift Station 46 Lump <br />Sum 1 N/A $_______.__ <br />_