My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Port Gardner Storage Facility Volume 7 Attachment O <br /> Page 1 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br /> <br /> <br /> <br /> <br /> <br />PORT GARDNER STORAGE FACILITY – <br />FACILITY CONSTRUCTION PACKAGE <br />WO# UP-3525 <br /> <br />VOLUME 7 ATTACHMENT O – <br />BIDDER QUESTIONS AND RESPONSES FROM FIRST BID PERIOD <br /> <br />The following questions and responses from the first bid period remain valid for the <br />current bid period ending with a published bid date of October 21, 2025. This <br />information is being provided as clarifications for the current bid period. <br />Q1 - STD Detail drawings C24001P & C24005P: Call out for a 3/8" EYE HOOK set in a <br />9" footing that is supposed to secure a 1-5/8" OD bottom rail. There is no eye hook on <br />the market unless this is referring to a turnbuckle that has and eye bolt end and an <br />opposing hook bolt end. Can you provide clarity to the item/device that will secure the <br />rail to the footing? Can you provide detail as to the embedment into the footing of this <br />item/device? <br />Bottom rail may be replaced with bottom tension wire. Refer to C24002C for <br />bottom tension wire and post connection details. <br /> <br />Q2 - STD Detail drawings C24001P & C24005P: Is it the intention of having the 1-5/8" <br />OD bottom rail pass through the inside diameter of the eye bolt (or hook bolt)? <br />Bottom rail may be replaced with bottom tension wire. Refer to C24002C for <br />bottom tension wire and post connection details. <br /> <br />Q3 - In reference to division 32 31 13 2.01.E.1, can ASTM F1043 Group IC w/ a 50k <br />PSI yield strength be another fence framework option besides ASTM F1083 Group IA <br />30k PSI? <br />Yes, F1043 Group IC w/ 50 PSI yield strength is an acceptable alternate. <br /> <br />Q4 – Would you be able to provide the treatment flow rates required for the Stormwater <br />Treatment System on the PGSF project? <br /> <br />Per Design Criteria and Summary Drawing G-00-5001 Table 6, the design <br />infiltration rate for the stormwater treatment system is 100 inches per hour.
The URL can be used to link to this page
Your browser does not support the video tag.