My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Port Gardner Storage Facility Volume 7 Attachment O <br /> Page 7 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />As identified in Keynote 7 on Drawing D-40-1004, the stormwater treatment media <br />and underdrain piping for the southern six cells will be furnished and installed <br />under a separate contract. <br />Q27 – Spec 01 72 29 does not appear to address concrete demolition where rebar is impacted, <br />in Sections 3.4 and 3.5. If rebar is cut at an impacted surface, is there a burn back (or removal) <br />to a certain depth before concrete patching proceeds? <br />See Note C12 on Drawing S-00-0001. <br />Q28 – Spec 01 72 29 3.4 (Cutting) D says to “Cut holes, slots and saw cuts to obtain clean cuts <br />and even lines in sizes and areas as necessary to complete work with no evidence of <br />patching.” Will the area of repair (removal and patch) to these extents be measured at the time <br />of repair and be available for changed condition work and be paid for separately? <br />See Drawings to inform quantity takeoffs of the areas of cutting and removal. <br />Patching due to overcuts and uneven cuts is undesirable. <br />Q29 – Drawing S-20-3011, Detail E, calls for Epoxy Dowels. Confirm they are to be place 12” <br />apart at each row. <br />Correct, per Drawing S-20-3004 Detail E callout, #6 @ 12" epoxied dowels to <br />match slab reinforcement with the option to stagger bottom and top row. <br />Q30 – Drawing S-20-3011, Detail A (typ for concrete fill locations). Is there to be any cleaning <br />or surface prep required before placing Cellular Concrete Fill at any location where being placed <br />within confined concrete walls? <br />Surface preparation for placing cellular concrete fill at any location where it is <br />being placed within confined concrete walls requires the same preparation as <br />concrete pours against existing concrete. Additionally, contractor to verify with <br />cellular concrete sub if additional prep is needed. <br />Q31 – Drawing S-25-3010, Detail B, please provide dowel information such as material <br />type/size/ spacing/ embed depth. <br />Per Detail S39004 called out in Detail B on Drawing S-25-3010, #5 epoxied dowels <br />@ 12" with 8" embed. If thickness of concrete is limited reduce to 6" embed. <br />Q32 – Drawing S-25-3010, Detail F, calls for Epoxy Dowels. Please confirm they are to be <br />place 12” apart at each row. <br />Correct, with option to stagger top and bottom row. <br />Q33 – Drawing S-30-3011, Detail E. Please confirm the dowels are to match the spacing of the <br />rebar cages. <br />Yes, dowels to match the spacing of wall reinforcement. Horizontal bars should <br />be dowelled into walls as well.
The URL can be used to link to this page
Your browser does not support the video tag.