My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Port Gardner Storage Facility Volume 7 Attachment O <br /> Page 25 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />Micropile design loads are shown on the May 2025 Geotechnical Report Port <br />Gardner Wet Weather Design Tables 2, 3, and 4. No lateral capacities are <br />intended for micro piles. <br />Q125 - Specification 31 63 33 – Please clarify which party is responsible for the design <br />of micropiles, specifically, who will design the casing size, reinforcing bar, bond length <br />and top connection details. <br />Micropile design is the delegated responsibility of the contractor. The design <br />must conform to the requirements of 31 63 33. <br />Q126 - Confirm that no grating is required for the sumps in the vault structures- 1/S-30- <br />2006 and A/S-30-2007. <br />Confirmed, no grating is required for the sumps indicated. <br />Q127 - The handrail material type is not called out on the drawings (S-20-1002, <br />Keynote-2/A-25-1001, S-25-1002- around hatchway, and existing handrails at the <br />primary combined sewer storage). Should we assume all handrails to be Aluminum as <br />per Note-1 of Standard details (S56001P)? <br />Guardrails in Area 25 shall be galvanized steel to match cross over ladder. <br />Guardrails in Area 20 shall be removable aluminum per 05 52 10 and Standard <br />Details. <br />Q128 - S-35-3003: General Note says all steel to be galvanized, and 2/S-50-1001 says <br />to provide top mounted guardrail. Are all the railings at the Equalization structures and <br />flow distribution structures to be galvanized steel? <br />Yes <br />Q129 - 1/S-70-3003 shows concrete on both the stair top landings. Confirm if the 2" <br />steel deck with concrete has to be provided at the top landings. Also, provide <br />connection details for the second floor landing (El 34.87'). <br />Top of both stair landings shown on S-70-1002 should be grating. Match top of <br />grating with top of concrete deck. <br />Q130 - Inside Area 30 Primary Storage Facility (cells 1-6), there is a new 4'0"W sloped <br />concrete fill between existing walls at Lines 4,6 and the flushing gates (t/conc elevation <br />17.67 to 16.87). Please provide details on concrete class, reinforcement, and joint <br />details for the concrete fill. <br />This area shall be 65 pcf Cellular Concrete Fill with a 4" topping slab with WWF <br />6x6xW4.0xW4.0 similar to that shown on S-30-3003. <br />Q131- Standard Plan S39101P shows a cone shape on the bottom of the pile. Do the <br />driven piles require a cone?
The URL can be used to link to this page
Your browser does not support the video tag.