My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Addendum 1 Page 8 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />3. A release has been obtained from the Washington State Department of <br />Revenue; and <br />4. Affidavits of Wages Paid for the Contractor and all Subcontractors are on <br />file with the Owner (RCW 39.12.040); and <br />5. A release has been obtained from the Washington State Department of <br />Labor & Industries and the Washington State Employment Security <br />Department; and <br />6. All claims, as provided by law, filed against the retainage have been <br />resolved. In the event claims are filed and provided the conditions one <br />through five are met, the Contractor will be paid the retained percentage <br />less an amount sufficient to pay any such claims together with a sum <br />determined by the Owner sufficient to pay the cost of claims and <br />attorney’s fees. <br />7. All other conditions required by law are satisfied. <br />For the purposes of retainage, the date of “completion of all work” is deemed <br />to be the same date as the date of Final Acceptance.” <br />Item 8 - SPECIFICATION 00 72 00 GENERAL CONDITIONS: <br />Delete the first sentence of Section 11 and Replace with the following: <br />“Upon discovery and before such conditions are disturbed, the Contractor <br />shall provide Notice to the City’s Representative within 14 calendar days of <br />such discovery of:” <br />Item 9 - SPECIFICATION 00 72 00 GENERAL CONDITIONS: <br />Delete Section 11, item 1 and Replace with the following: <br />“Pre-existing subsurface or latent physical conditions at the site differing <br />materially from those indicated in the Contract Documents, or:” <br />Item 10 - SPECIFICATION 00 72 00 GENERAL CONDITIONS: <br />Delete Section 15.2.2 and Replace with the following: <br />“The Contractor shall, prior to the release of Final Payment, furnish separate <br />Maintenance (or Guarantee) Bonds in form acceptable to the Owner written <br />by the same corporate surety that provides the Payment and Performance <br />Bond for this Contract. These bonds shall secure the Contractor's obligation <br />to replace or repair defective materials and faulty workmanship for a minimum <br />period of two (2) years after Final Payment and shall be written in an amount <br />equal to one hundred percent (100%) of the Contract Sum, as adjusted (if at <br />all).”
The URL can be used to link to this page
Your browser does not support the video tag.