My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Port Gardner Storage Facility Volume 7 Attachment O <br /> Page 28 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />150 ksi is acceptable. Project specifications are designed for lower strength bars. <br />If alternative grade is used, splice length, development length, embedment depth, <br />and steel fabrication and testing must comply with applicable ACI standards for <br />150 ksi steel. <br />Q144 - Please confirm mill secondary micropile casing can be used for micropile casing. <br />Confirmed that secondary micropile casing can be used for micropile casing. <br />Q145 - Please confirm Type 1L cement can be used to prepare micropile neat cement <br />grout due to local availability. <br />Confirmed. <br />Q146 - Standard detail for Manhole Pile Supports C82001P calls out 9-micropiles while <br />the table on Sheet S-00-0005 only lists 8-micropiles at CSMH-15-01 and CSMH-15-02 <br />each. <br />Refer to Drawing S-00-0005 for the number of piles to be installed at each <br />structure. The number of piles show in in Standard Detail C82001P is intended to <br />be diagrammatic. <br />Q147 - Please confirm only the 10-micropiles at the Combined Sewer Debris Removal <br />building will be installed indoors while all other micropiles will be installed outdoors with <br />no overhead structure restrictions. <br />The 10 piles specified for Area 25 will be installed under a new addition that is <br />being added to the existing structure, not inside the building. Additionally, four <br />piles will be installed within the Area 40 Diversion Structure, see Drawing S-40- <br />1003. This project selectively uses micropiles in lieu of the 18" steel piles due to <br />limited overhead clearance areas on the project site. For example, the close <br />proximity of CSVT 10-01 to overhead power lines. <br />Q148 - Dwg S-20-3010 Detail “F” calls out “NEW TYPE E FILL CONC”. Can you please <br />provide a specification for that concrete type? <br />See specification 03 30 00 Paragraph 2.02.A <br />Q149 - Dwg S-20-3002, Key Note 2 refers to Specification Section 33 05 13, however <br />section 2.24 of the referenced spec section makes no mention of this location in the <br />“Manhole Schedule”. Please clarify. <br />Keynote 2 references Section 33 05 15 as it describes frames and covers. Cover <br />in question shall be 36”, pressure rated and watertight and shall be as <br />manufactured by EJCO or approved equal (per COE STDs). <br />Q150 - Dwg S-20-1002 Roof Plan lacks details for connection of new roof slab to the <br />existing exterior walls. Please clarify if structural connection is required.
The URL can be used to link to this page
Your browser does not support the video tag.