Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Port Gardner Storage Facility Volume 7 Attachment O <br /> Page 30 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />The 6" SW drain under the foundation of the Diversion Structure is existing. The <br />as-builts for this pipe are shown in Volume 7, Attachment A, Drawing B-9744. See <br />6" diameter pipe shown under "Floatation Thickener No. 1" on this drawing. <br />During the recently completed site demolition project, this drain pipe was field <br />located, demolished just beyond the outside tank wall, and capped with a <br />restrained joint and blind flange. The extent of the existing 6" pipe that remains <br />beyond the tank wall must be field verified. For the purposes of bidding, assume <br />the extent of existing 6" SW pipe shown on Drawing D-40-1001. <br />Q157 - On drawing AX-70-1002, keynotes 1 and 2 are exactly the same. Please <br />confirm, it is deliberate. <br />They are the same note. This is a redundant note but the scope is correct. <br />Q158 - 4. Spec 40 41 00-3.02 does not specify heat trace cable suitable for submerged <br />service. Please specify. <br />Submerged heat trace cable is not required. <br />Q159 - Please confirm services listed to require freeze protection that may be <br />submerged require heat trace and insulation, and outline services that are considered <br />"submerged - exposed". <br />Submerged heat trace cable is not required. <br />Q160 - Reference Drawing #C-10-1102: Upper left Vault or slab (north of) near Detail 4 <br />undefined. Please clarify. <br />Not a vault, it is a catch basin. Per General Note 3 on C-1202, stormwater <br />structure tables containing horizontal controls are on C-10-1305. <br />Q161 - Reference Drawing #C-10-1102: Possible bollards-slab (north of) Area 60 <br />Effluent Pump Station undefined. Please clarify. <br />These are pile support towers, see drawing S-60-1005. <br />Q162 - Reference Drawing #C-10-1102: Slab between Area 40 Stormwater Treatment <br />& Area 40 Stormwater Diversion undefined. Please clarify. <br />This concrete slab is to provide protection to the underlying pipe and is shown in <br />Detail B on drawing CD-10-7005. <br />Q163 - Reference Drawing #C-10-1102: Stair slabs around Area 55 and 35 undefined. <br />Please clarify. <br />Stair locations are defined in associated structural drawings per keynote 12 and <br />16. Area 35 stairs are defined on drawing S-35-1001 and Area 55 stairs are defined <br />on drawing S-55-1001.
The URL can be used to link to this page
Your browser does not support the video tag.