Laserfiche WebLink
Port Gardner Storage Facility Volume 7 Attachment O <br /> Page 41 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />Q219 - As we review the documents for project Q2522G80 – Port Gardner, Everett, <br />WA, we noted that two (2) surge tanks are specified: 1. 46-ST-0130 – Bladder-Type <br />Surge Tank (Section 43 16 23.02) 2. 46-ST-0230 – Dipping Tube Style Surge Tank <br />(Section 43 16 23.03) We would appreciate clarification from the engineer or contractor <br />on the following points: If the dipping tube design is mandatory for one of the tanks, <br />would submitting a proposal for only one tank still be considered valid participation in <br />the bidding process? <br />Submitting a proposal for one tank will be considered valid participation if the <br />submitted equipment meets the criteria outlined in the specifications. <br />Q220 - Specification 10 14 23.16 3.02 A provides table of room identification sign <br />schedule. Please confirm no more room identification signs are needed. In case more <br />are needed, please provide the full schedule or confirm if every room on this project <br />receives a room identification sign. <br />The schedule is correct for the current scope of occupied areas. <br />Q221 - For the 8 Lockers in the OMES Building, there are different colors offered for the <br />specified brands and may affect the pricing considerably. So, please confirm what color <br />of Lockers is needed in the OMES Building <br />Use light blue as the color selection for bidding purposes <br />Q222 - On bid form 00 41 13 - 8, at the bottom of the page under the spot for <br />Contractor's License No., it says "Washington State_________". Please confirm what <br />should be entered here, is this for the UBI number? <br />Confirmed. <br />Q223 - Bid form 00 45 19 Non-Collusion Affidavit requires a notarization. Based on the <br />wording of the form, this must be a Washington based notary. As we are signing the <br />forms in a different state, are we able to use a notary from our state and adjust the <br />wording on the form? <br />Yes <br />Q224 - Is the Naval Station building to the north of the project built on piles? <br />The City does not have any information related to construction of the Naval <br />Station buildings to the north of the project site. <br />Q225 - We are having difficulty finding a supplier to provide the lightweight trench <br />backfill material. Would the attached product be acceptable? If not, can you please <br />advise where we are to get such material? <br />Contractor to submit full materials report per 31 23 00 1.03.B, with any deviations <br />from the specification clearly identified, for review and approval during the <br />submittal review process.