My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CUES, Inc. 12/9/2025
>
Contracts
>
Agreement
>
Other Procurement Agreements
>
CUES, Inc. 12/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2025 9:04:31 AM
Creation date
12/10/2025 9:00:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
CUES, Inc.
Approval Date
12/9/2025
Council Approval Date
12/3/2025
End Date
12/31/2026
Department
Finance
Department Project Manager
Jenny Chang
Subject / Project Title
Drainage and Sewerline Truck Purchase
Tracking Number
0005036
Total Compensation
$744,313.67
Contract Type
Agreement
Contract Subtype
Other Procurement Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Terms and Conditions - 5 <br />HEREBY. EACH PARTY AGREES THAT ANY SUCH ACTION, SUIT, OR PROCEEDING SHALL BE <br />TRIED BEFORE A COURT AND NOT A JURY. <br />P. Force Majeure. Whenever a period of time is prescribed for the taking of an action by either <br />party hereto, the period of time for the performance of such action shall be extended by the <br />number of days that the performance is actually delayed due to (a) general strikes, (b) acts of <br />God, (c) material shortages, (d) war, (e) terrorist acts, (f) civil disturbances, (g) floods, (h) <br />earthquakes, (i) fires, or (j) other causes beyond the reasonable control of the performing <br />party, and, with respect to Seller’s performance, any delays incurred by Seller as a result of <br />the nonperformance or delay by the City of any of its obligations hereunder, and, with respect <br />to City’s performance, any delays incurred by City as a result of the nonperformance or delay <br />by Seller of any of its obligations hereunder (“Force Majeure”). Any party hereto claiming a <br />right to a Force Majeure extension shall notify the other Party immediately of the claimed <br />right to an extension and the specific claimed basis for the extension. No Force Majeure <br />extension shall be in total greater than six months unless approved in writing by the Mayor of <br />the City and by an authorized representative of the Seller. <br />Q. Signature/Counterparts. This Agreement and any amendment thereto may be signed in <br />counterparts, each of which shall be deemed an original, and all of which, taken together, shall <br />be deemed one and the same document. AdobeSign signatures are fully binding. Any ink, <br />electronic, faxed, scanned, photocopied, or similarly reproduced signature on this Agreement or <br />any amendment hereto will be deemed an original signature and will be fully enforceable as an <br />original signature. <br />R. Limitation of Liability. Except as expressly provided herein, Seller shall not be liable under any <br />theory for incidental, indirect, special, or consequential damages, including loss of profits, use, <br />business, or opportunity. Seller’s maximum liability shall not exceed the purchase price actually <br />paid for the Apparatus giving rise to the claim. Any action must be commenced within one year <br />of accrual. <br /> <br />END OF TERMS AND CONDITIONS
The URL can be used to link to this page
Your browser does not support the video tag.