Laserfiche WebLink
Vjendo- <br />IF <br />SAI� <br />UNPACKING <br />1) Remove the crating materials <br />from the unit (shipping straps, <br />corner brackets, wood panels & <br />cardboard corner posts) <br />2) Slide the unit REARWARDS off pallet onto dolly(s) or loading <br />mules. Note: DO NOT use the unit casters to move the unit <br />anywhere other than in its final installation location. <br />11 <br />