My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/12/10 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/12/10 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 8:54:16 AM
Creation date
12/11/2025 8:47:05 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/10/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 10 of 21 <br />2.7 CONSULTANT RESPONSIBILITIES & EXPECTED DELIVERABLES <br />The awarded supplier will be responsible for the following: <br />1. Existing facility assessment report; <br />2. Site comparisons and parcel size analysis; <br />3. Phase 1 Environmental Site Assessment for each site; <br />4. Space program requirements by function; <br />5. Conceptual layout alternatives; <br />6. Cost estimates and phasing strategy; <br />7. Recommendation report with preferred option; <br />8. Title VI Equity Analysis with completed public outreach for each location. <br />9. Consolidate all findings, comparative analysis, and stakeholder input into the final feasibility <br />study, supported by site visuals and cost phasing. <br />2.8 CITY OF EVERETT RESPONSIBILITIES <br />The City of Everett will provide the following: <br /> serve as the primary contact for the consultant. <br /> background and requirements. <br /> existing available data and reports to support analysis. <br /> coordinate review of consultant deliverables. <br /> Be responsive to edits to documents before they are finalized. <br />2.9 CHANGES IN THE SCOPE OF WORK <br />The City reserves the right to add or delete similar services, such as follow-on reports or report updates, <br />to this contract as necessary. In the event of a change, the City of Everett will provide the supplier with <br />thirty (30) days' written notice of such change. <br /> <br />In addition, the City of Everett reserves the right to make changes, additions to, or deductions from this <br />Scope of Work, provided that they conform to the general scope of the contract. The Supplier will not <br />affect any change without the prior written approval of the City. <br />2.10 WORK MADE FOR HIRE <br />All Deliverables, in whole and in part, shall be deemed works made for hire of the City of Everett for all <br />purposes of copyright law, and copyright shall belong solely to the City of Everett. To the extent that any <br />such Deliverable does not qualify as a work for hire under applicable law, and to the extent that the <br />Deliverable includes materials subject to copyright, patent, trade secret, or other proprietary right <br />protection, Awarded Supplier agrees to assign, and hereby assigns, all right, title and interest in and to <br />Deliverables, including without limitation all copyrights, inventions, patents, trade secrets, and other <br />proprietary rights therein, including renewals thereof, to the City of Everett. <br />2.11 PAYMENT <br />Within thirty (30) days after delivery, acceptance of the provided deliverable, and a properly prepared <br />invoice, but not more often than once per month, the City of Everett will pay the supplier according to the <br />rate(s) stated on the price sheet.
The URL can be used to link to this page
Your browser does not support the video tag.