My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/12/10 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/12/10 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 8:54:16 AM
Creation date
12/11/2025 8:47:05 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/10/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 12 of 21 <br />SECTION 3 – PROPOSAL EVALUATION PROCESS <br />3. 1 GENERAL <br />All proposals will be reviewed to determine compliance with the requirements as specified in the RFP. <br />Proposals will be evaluated on how well the proposal meets the needs of the City, as described in the <br />supplier’s response to each requirement and the evaluation criteria identified in this RFP. It is important <br />that the responses be clear and complete so that the evaluators can adequately understand all aspects of <br />the proposal. <br />3.2 SELECTION PROCESS <br />The City will select the proposal that, in its sole discretion, is the most advantageous to the City. The City <br />reserves the right to make an award without further discussion of the proposal submitted; there may be <br />no best and final offer procedure. Therefore, the proposal should be initially submitted on the most <br />favorable terms that the supplier can offer. The specifications may be altered by the City of Everett based <br />on the supplier’s proposal, and an increase or reduction of services with the supplier may be negotiated <br />before contract signing, award, and execution. <br />3.3 CONTRACT AWARD AND EXECUTION <br />A contract award will be given to the supplier that best meets the needs of the City of Everett. <br />The award of a contract to the successful supplier will be the notice of acceptance. The award of a <br />contract will bind the supplier to furnish the service in accordance with the information herein, responses <br />to questions, the supplier’s proposal, other representations made, and all other terms and conditions of <br />the contract in its final form. <br />3.4 EVALUATION CRITERIA <br />Proposals will be evaluated based on the following weighted criteria and how well they meet the needs <br />and requirements as described in the RFP. <br /># Criteria Points Description <br />1 Qualifications and Relevant <br />Experience <br />75 Evaluate responses to Questionnaire 4.03. <br />2 Technical Capability, Approach, <br />and Capacity <br />75 Evaluate responses to Questionnaire 4.03. <br />3 Communication, Customer <br />Services, and Training <br />50 Evaluate responses to Questionnaire 4.03. <br />4 Risk, Performance, and Quality <br />Assurance <br />30 Evaluate responses to Questionnaire 4.03. <br />5 Price Proposal 70 Evaluate Suppliers’ price proposals to determine if the cost is <br />fair and reasonable. Proposed prices: <br /> are realistic for the work to be performed and <br /> demonstrate that the Supplier understands the Scope of <br />Work. <br />Total 300
The URL can be used to link to this page
Your browser does not support the video tag.