Laserfiche WebLink
<br /> <br /> <br />Part A2 – Labor and Delivery <br /># Description – per Section 2 <br />Specifications <br />Unit of <br />Measure <br />Unit Price Estimated <br />Quantity <br />Extended <br />Price <br />1 <br />Labor per Section 2.21, to upfit vehicles <br />with supplied parts. <br />Contractor to supply incidental supplies <br />such as paint. <br />HOUR $ 500 $ <br />2 Pick-Up FLAT FEE $ 8 $ <br />3 Standard Delivery FLAT FEE $ 8 $ <br />4 Expedite: Delivery within 60 days from <br />receipt of vehicle FLAT FEE $ 2 $ <br />Part A2 Labor and Delivery Subtotal: $ <br /> <br />Copy category subtotals from the previous pages. If there is a conflict between a subtotal listed above and the <br />subtotal listed below, the mathematically correct subtotal will prevail. <br />Category Description Subtotal <br />Part A1 – Equipment $ <br />Part A2 – Labor and Delivery $ <br />Subtotal: $ <br />9.9% Sales Tax: <br />9.9% sales tax is being used for award purposes only. If the City opts to pick up the completed <br />vehicle, the actual sales tax will be paid according to the location where the pick-up occurred. <br />$ <br />Part A – Total used for award: $ <br />Do you certify that you are NOT on the Comptroller General’s list of ineligible contractors, nor the list of parties <br />excluded from Federal procurement or non-procurement programs? Yes  No  <br />Do you agree to provide these products to other public agencies pursuant to RCW 39.34 and Section 1.21 <br />above? Yes  No  <br />State the estimated or average number of calendar days to have equipment constructed and installed on a <br />chassis or cargo van after receipt of order: <br />State the estimated or average number of calendar days to have a completed vehicle delivered to the City: <br />State the estimated or average number of calendar days to have a completed vehicle available for pick-up: <br />