My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/12/10 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/12/10 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 8:54:16 AM
Creation date
12/11/2025 8:47:05 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/10/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Project title: An Ordinance closing a Special Improvement Project entitled “WFP Air Scour Blower Building <br />Replacement” Fund 336, Program 034, as established by Ordinance No. 4039-24. <br />Council Bill # interoffice use <br />CB 2511-83 <br />Project: WFP Air Scour Blower Building Replacement <br />Partner/Supplier: <br /> Location: Water Filtration Plant <br />Preceding action: Ordinance No. 4039-24, approved 8/14/24 <br />Fund: 336 – Water & Sewer System Improvements Fund <br />Agenda dates requested: <br />Proposed action 12/03/25 <br />Proposed action 12/10/25 <br />Consent <br />Action 12/17/25 <br />Ordinance X <br />Public hearing <br />Yes X No <br />Budget amendment: <br />Yes X No <br />PowerPoint presentation: <br />Yes X No <br />Attachments: <br />Proposed Ordinance <br />Department(s) involved: <br />Public Works, Admin <br />Contact person: <br />Ryan Sass <br />Phone number: <br />(425)257-8942 <br />Email: <br />RSass@everettwa.gov <br />Initialed by: <br />RLS <br />Department head <br />Administration <br />Council President <br />Fiscal summary statement: <br />Ordinance No. 4039-24 appropriated $1,350,000 in funds to Fund 336, Program 034 for <br />the improvements. <br />The design and construction phases of this project were completed at a cost of <br />$1,170,195. <br />Project summary statement: <br />This project included the demolition and replacement of an existing 250 square-foot <br />building located on the south end of the filter building. A new structure was constructed <br />adjacent to the existing building, which will house two air scour blowers and associated <br />electrical and control components. <br />The air scour blower system agitates water filtration media during the filter backwash <br />process and is a critical component of the filtration system. <br />The project has been completed, all necessary replacements and upgrades have been <br />installed. <br />Recommendation (exact action requested of Council): <br />Adopt an Ordinance closing a Special Improvement Project entitled “WFP Air Scour <br />Blower Building Replacement” Fund 336, Program 034, as established by Ordinance No. <br />4039-24. <br />City Council Agenda Item Cover Sheet
The URL can be used to link to this page
Your browser does not support the video tag.