My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
706 94TH ST SE 2025-12-16
>
Address Records
>
94TH ST SE
>
706
>
706 94TH ST SE 2025-12-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2025 8:32:03 AM
Creation date
12/11/2025 4:02:42 PM
Metadata
Fields
Template:
Address Document
Street Name
94TH ST SE
Street Number
706
Notes
STERLING INV LLC 706 94TH ST SE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Receipt # <br />PUBLIC WORKS DEPARTMENT <br />Utilities Division, 3200 Cedar Street <br />Everett WA 98201 <br />425-257-8800 <br />• <br />Cost of Work Order 1,878.00 <br />Cost of Service Order <br />Contact Person <br />Requested By Gordon Witcher <br />Property Owner (name) R & G Sterlin <br />Charge Cost to (name if different than owner) <br />Address 2131 1061h St SE <br />City Everett <br />OCT 0 5 2006 <br />........................... .... <br />CffY bF EVERF:i7 <br />Engineering/Public sai dices <br />Date Paid <br />Work Order# <br />Service Order # <br />Telephone # <br />Date of Request <br />Installation Location 706 94th St SE <br />Installation type/description/size/etc. Relocate hydrant to back of sidewalk. <br />425 387-9071 <br />10-2-06 <br />Zip 98208 <br />❑ The following estimate is based upon the Utilities Division providing all labor, equipment, <br />materials, restoration, and final hook-up. <br />Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br />date to allow for scheduling and parts procurement <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br />administrative costs, the deficit shall be charged to the property for which such installation was made and the <br />owner thereof, and provided further, that any excess payment shall be returned to the person applying for the <br />installation. <br />*Deposit must be paid prior to ordering parts or scheduling work. <br />WATER METERS 3" AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br />cc: Bldg. Permit Center <br />Material <br />334.00 <br />Mark Sadler <br />Kirk Brooks <br />Labor and Benefits <br />1,167.00 <br />Gordon Witcher <br />Equipment Rental <br />344.00 <br />Robert Waddle <br />Matt Welborn <br />Tax <br />33.00 <br />Benyam Stephanos <br />TOTAL <br />$1,878.00 <br />Gerry Crum <br />Dennis Roberson <br />Prepared by: <br />Accepted by: <br />Gerry Crum d-ClZli"' �astimate Prepared 10-3-06 <br />Representing <br />ESTIMATE GOOD FOR 6 MONTHS <br />SMCommonklericahCost.e 6MG Ster ing.DOC 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.