My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25 113TH ST SE 2025-12-12
>
Address Records
>
113TH ST SE
>
25
>
25 113TH ST SE 2025-12-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2025 1:05:14 PM
Creation date
12/12/2025 1:04:58 PM
Metadata
Fields
Template:
Address Document
Street Name
113TH ST SE
Street Number
25
Notes
NEWLANDER 25 113TH ST SE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date 3,12,%%OQ7 <br />PUBLIC WORK % <br />Public Works Permit�T,5-Q7Q3"0QQ <br />PERMIT Building Permit # <br />PUBLIC WORKS DEPARTMENT Planning Reference # <br />3200 Cedar Street <br />Everett, WA 98201 Public Works Fee $ <br />(425) 257-8810 <br />Guarantee $ U' <br />OWNER NAME APPLICANT NAME <br />ANDADDRES3^D NEFUp}DEER AND ADDRESS: <br />ST SE <br />EVE <br />PHONE: PHONE: <br />TAX PARCEL I.D.# PROJECTADDRESS: <br />DESCRIPTION OF <br />PROPOSED WORICi�i'Jl `� I' i'<`7` �% T"tL{ 'i �t r }, t�'`i Tom' ( '— r3 r,— - 2 4 <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-800-42475555 <br />W <br />PER t h;' °1ED PLAN <br />.--r: <br />�_ z <br />Lny <br />2cCn <br />-' <br />• t mi 4...1 <br />c�' C-71 <br />_.� <br />a <br />Approved for Construction <br />ECTION <br />as Constructed <br />Date <br />Date <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement or <br />other right-of-way use hereto applied for and further agrees to <br />remove same upon notice from the City and to replace public <br />property damaged thereby. <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED <br />TO COMPLETION. THIS PERMIT MAYBE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />EPWP (7/06) DATABAR, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.