My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/11/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/11/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2025 2:38:17 PM
Creation date
12/12/2025 2:35:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/11/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
16 <br />ARTICLE 10 <br />PRE-JOB CONFERENCE <br />10.1.The General Contractor will conduct a pre-job conference with the Union(s), the <br />Council and all other Employers prior to commencing work. The General <br />Contractor shall notify the Council of all Employers that have been awarded project <br />work ten (10) working days in advance of all such conferences and each such <br />Employer shall participate in such conferences. One week after the pre-job <br />conference and prior to starting work, the General Contractor and all Employers <br />shall submit a final trade assignment. All work assignments shall be disclosed by <br />each Employer at the pre-job conference and such assignments shall be made in <br />accordance with industry practice. Should additional project work not previously <br />included within the scope of the project work be added, the Employer performing <br />such work will conduct a separate pre-job for such newly included work. <br />10.2.Employers who have performed or are performing work on any other regional PLA <br />or CWA projects may be eligible for a waiver of the pre-job conference. Waivers <br />requests must be submitted to the Council a minimum of three weeks prior to the <br />start of work. If the waiver is denied, the Employer is required to attend a pre-job <br />conference prior to starting work according to the process stated above.
The URL can be used to link to this page
Your browser does not support the video tag.