My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BCE Engineers, Inc / GFT Infrastructure, Inc. 12/11/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
BCE Engineers, Inc / GFT Infrastructure, Inc. 12/11/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2025 2:44:19 PM
Creation date
12/12/2025 2:44:08 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BCE Engineers, Inc / GFT Infrastructure, Inc.
Approval Date
12/11/2025
Council Approval Date
11/1/2023
End Date
6/30/2025
Department
Transit
Department Project Manager
Vincent Bruscas
Subject / Project Title
Cabinet Charger Installation at Public Works Yard Assignment and Assumption of Contract
Tracking Number
0004003
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2 <br />IN WITNESS WHEREOF, the Parties have executed this Assignment and Assumption of <br />Contracts as of the Effective Date. <br />BCE Engineers, LLC GFT Infrastructure, Inc. <br />By: By: <br />Printed: Printed: <br />Title: Title: <br />Date: Date: <br />Acknowledged and Approved: <br />City of Everett – Transit <br />By: <br />Printed: <br />Title: <br />Date: <br />Cassie Franklin <br />Mayor <br />12/11/2025
The URL can be used to link to this page
Your browser does not support the video tag.