My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
506 E VIEW RIDGE DR 2025-12-17
>
Address Records
>
E VIEW RIDGE DR
>
506
>
506 E VIEW RIDGE DR 2025-12-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 9:10:27 AM
Creation date
12/17/2025 9:09:57 AM
Metadata
Fields
Template:
Address Document
Street Name
E VIEW RIDGE DR
Street Number
506
Notes
BARTON 535 E VIEW RIDGE DR
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Receipt # <br />YY <br />n,o <br />Cost of Work Order <br />Cost of Service Order <br />Contact Person Kelvin Barton <br />Requested By Gordon Witcher <br />PUBLIC WORKS DEPARTMENT <br />Utilities Division, 3200 Cedar Street <br />Everett WA 98201 <br />425-257-8800 <br />Property Owner (name) Barton <br />Charge Cost to (name if different than owner) <br />Address 506 E. View Ridge Drive <br />Installation Location 425 E. View Ridge Drive <br />zn*Zn <br />Cite <br />HS'QflRU\VL5V <br />APR i 1 2005 <br />LIU... .......................... <br />CITY OF EVERETT <br />Antgineering/Public Services <br />a e Paid <br />Work Order# <br />Service Order # <br />Telephone # <br />Date of Request <br />Everett Zip 98302 <br />Installation type/description/size/etc. 6" tap, increase to 8"; make final connection after purity. <br />Developer to expose, shore, restore. <br />❑ The following estimate is based upon the Utilities Division providing all labor, equipment, <br />materials, restoration, and final hook-up. <br />Please notify the City of Everett Utilities Division 10 working_days in advance of required installation <br />date to allow for scheduling and parts procurement <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br />administrative costs, the deficit shall be charged to the property for which such installation was made and the <br />owner thereof, and provided further, that any excess payment shall be returned to the person applying for the <br />installation. <br />*Deposit must be paid prior to ordering parts or scheduling work. <br />WATER METERS 3" AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br />Material <br />Labor and Benefits <br />Equipment Rental <br />Tax <br />TOTAL <br />Prepared by: <br />Accepted by: <br />$1480.00 <br />1094.00 <br />408.00 <br />52.00 <br />$3034.00 <br />Gerry Crum e Estimate Prepared <br />Representing <br />ESTIMATE GOOD FOR 6 MONTHS <br />cc: Bldg. Permit Center <br />Mark Sadler <br />Kirk Brooks <br />Gordon Witcher <br />John McClellan <br />Matt Welborn <br />Benyam Stephanos <br />Gerry Crum <br />Dennis Roberson <br />Cliff Lindman <br />Randy Allen <br />04/09/2008 <br />S:\#Commonklerical\Cost.est\2008\425 E View Ridge Drive.DOC I of I <br />
The URL can be used to link to this page
Your browser does not support the video tag.