My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-99 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />and/or materials so destroyed. Nothing herein provided for shall in any way excuse <br />the Contractor or its surety from the obligation of furnishing all the required materials <br />and completing the work in full compliance with the terms of the Contract. <br />1-07.20 Patented Devices, Materials, and Processes <br />Delete the first paragraph of 1-07.20 and substitute the following: <br />The Contractor shall assume all costs arising from the use of patented devices, <br />materials, or processes used on or incorporated in the Work, and agrees to indemnify, <br />defend, and save harmless the City, and its officers, employees and agents from all <br />actions of any nature for, or on account of the use of any patented devices, materials, or <br />processes. <br />1-07.23 Public Convenience and Safety <br />Delete the last sentence of the first paragraph of 1-07.23 and substitute the following: <br />Nothing contained in this Contract is intended to create any third-party beneficiary rights <br />in favor of the public or any individual utilizing the facilities being constructed or improved <br />under this Contract. <br />1-07.23(1) Construction Under Traffic <br />Revise the third sentence of the second paragraph to read as follows: <br />Do NOT impair accessibility to existing or temporary pedestrian push buttons. City <br />may allow activating pedestrian recall timing or other accommodations during <br />construction. <br />Supplement 1-07.23(1) by adding the following: <br />Only one lane closure is permitted on I-5 southbound bridge from 9 p.m. to 5 a.m., <br />Sunday through Thursday. No lane closure on I-5 will be allowed from 5:00 a.m. to. <br />to 9:00 p.m. every day, or from 9 p.m. Friday to 9 p.m. Sunday. <br />If Engineer determines the permitted closure hours adversely affect traffic, the <br />Engineer may adjust the hours accordingly. The Engineer will notify the Contractor <br />in writing of any change in the closure hours. <br />No lane closures will be allowed on a holiday or holiday weekend, or after 12:00 <br />p.m. on a day prior to a holiday or holiday weekend. A holiday weekend is defined <br />as having a holiday fall on Friday, Saturday, Sunday, or Monday. <br />Contractor shall provide a uniformed off-duty Police Officer to control traffic in critical <br />situations as determined by the Engineer. The uniformed officer shall be paid under <br />contract item “Traffic Control – Off-Duty Police Officer.” <br />Contractor shall notify the local Fire, Police and Engineering Departments before <br />the beginning of each phase of construction so that these agencies may re-route <br />their emergency vehicles around the construction zone. The non-emergency phone <br />number for Everett Police is 258-2484, for Fire Dispatch is 257-8757, and for Public <br />Works Engineering is 257-8800. <br />Contractor shall notify City of Everett Transit at 425-257-8984 and Community <br />Transit at 425-348-7100 of all street closures or delays at least 24 hours in advance <br />to enable rerouting of buses. <br />Contractor shall notify the property owners at least 72 hours in advance to enable them <br />to remove vehicles parked in the vicinity of Work. Towing vehicles shall be the <br />responsibility of the Contractor and no additional payment will be made. <br />Further supplement 1-07.23(1) by adding the following:
The URL can be used to link to this page
Your browser does not support the video tag.