My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-117 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />3. If a trustee or receiver is appointed for Contractor, or for any of Contractor's <br />property. <br />4. If Contractor files a petition to take advantage of any debtor's law, or to <br />reorganize under any bankruptcy chapter or law. <br />5. If Contractor repeatedly fails to make prompt payments to subcontractors <br />or others for labor, materials, or Equipment. <br />6. If Contractor disregards laws, ordinances, rules, regulations, or orders of <br />public bodies having jurisdiction. <br />7. If Contractor disregards the authority of the City or City’s Representative. <br />8. If Contractor substantially violates the provisions of the Contract <br />Documents or fails, neglects, or refuses to proceed in compliance with the <br />provisions of the Contract Documents. <br />9. If the Contractor made material misrepresentations to the City with respect <br />to: (a) its qualifications or those of its subcontractors; (b) its or its <br />subcontractors’ ability to perform the Work in a timely, workmanlike <br />manner; (c) the materials installed or to be installed; or (d) progress pay <br />estimates. <br />10. If Contractor fails to supply sufficient skilled workers or suitable materials <br />or equipment. <br />11. If Contractor refuses or fails to prosecute the Work with such diligence as <br />will ensure its Physical Completion within the original Physical Completion <br />time and any extensions of time which may have been granted to the <br />Contractor by change order or otherwise. <br />12. If Contractor disregards laws, ordinances, rules, codes, regulations, <br />orders, or similar requirements of any public entity having jurisdiction. <br />13. If Contractor performs Work which deviates from the Contract. <br />14. If Contractor otherwise violates in any material way any provisions or <br />requirements of the Contract. <br />After termination of the Contractor for default, the City may transfer performance of <br />the Work to the Contractor's Surety or elect to prosecute to completion by contract <br />or otherwise. <br />If the City chooses to provide such sufficiency of labor or materials as required to <br />complete the Work, the City may exclude the Contractor from the site and take <br />possession of the Work and all of the Contractor's tools, appliances, owned or <br />rented construction equipment, and machinery at the site and use the same to the <br />full extent they could be used by the Contractor. The City may incorporate in the <br />Work all materials and Equipment stored at the site or for which the City has paid <br />the Contractor, but which are not yet on site. In such case, the Contractor will not <br />be entitled to receive any further payment until the Work is finished. At the City’s <br />sole option, Contractor shall assign and transfer any contractual rights to material <br />and Equipment to be installed, incorporated, or used in the performance of the <br />Work. City shall credit Contractor for the reasonable fair market rental value of any <br />and all Contractor owned equipment for so long as retained and used by the City. <br />City shall credit Contractor for all materials and supplies on site or on order, but not <br />yet paid for by City, provided that ownership is transferred and assigned to the City <br />and the materials and supplies conform to the requirements of the Contract <br />Documents.
The URL can be used to link to this page
Your browser does not support the video tag.