Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div P – PROPOSAL October 2025 <br />Work Order No. UP 3814 SP-5 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between <br />the unit price and the total amount named for any item, the unit price shall prevail, and totals shall be corrected to <br />conform thereto. All entries must be typed or entered in ink. <br />BID SCHEDULE <br />BIDDER:___________________________ <br />Item No. ITEM DESCRIPTION Unit <br />Bid <br />Qty UNIT PRICE <br />TOTAL <br />AMOUNT <br />1 Mobilization LS 1 $ $ <br />2 Surveying LS 1 $ $ <br />3 Spill Prevention, Control & <br />Countermeasures (SPCC) Plan LS 1 $ $ <br />4 Force Account FA 50,000 $ 1.00 $ 50,000.00 <br />5 Record Drawings (Minimum Bid $1,500) LS 1 $ $ <br />6 Potholing EA 5 $ $ <br />7 Traffic Control Labor HR 1,000 $ $ <br />8 Maintenance and Protection of <br />Traffic Control LS 1 $ $ <br />9 Railroad Coordination and Permitting LS 1 $ $ <br />10 Remove Water Line and Supports – <br />Existing Bridge 645W LS 1 $ $ <br />11 Trench Excavation Safety Systems SF 450 $ $ <br />12 Street Cleaning and Sweeping HR 20 $ $ <br />13 Erosion/Water Pollution Control FA 8,000 $ 1.00 $ 8,000.00 <br />14 Saw-cutting Asphalt Concrete Pavement, <br />Final Joint Cut, Up to 6-inch Thickness LF 60 $ $ <br />15 <br />Saw-cutting Asphalt Concrete Pavement, <br />Final Joint Cut, Additional 1-inch <br />Thickness <br />LF 60 $ $ <br />16 Saw-cutting Concrete Curb & Gutter, <br />Sidewalk, and Driveway LF 25 $ $ <br />17 Foundation Material, Class A or B TON 10 $ $ <br />18 Gravel Borrow Incl. Haul TON 125 $ $ <br />19 Work Access – Bridge 645W <br />Water Lines and Supports LS 1 $ $ <br />20 Utility Supports on Bridge 645W LS 1 $ $