My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-137 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />1-09.11A(4)A1 Elements <br />Contractor shall only be entitled to an adjustment of Contract Sum for <br />Unabsorbed or Extended Overhead if it clearly and convincingly demonstrates <br />all of the following: <br />1. The City solely caused a Delay to the Completion Date as measured <br />by analysis of the project duration by the critical path method pursuant <br />to 1-08.3 PROGRESS SCHEDULE; <br />2. Because of the Delay described in subsection (1), the Contractor was <br />forced to suspend or significantly interrupt its performance so that it <br />was on standby or idled, and the City required the Contractor to be <br />ready to resume performance on short notice. Extended time of <br />performance of Work, such as extensions caused by changes, <br />inefficiencies, or extra Work, does not constitute suspension or <br />significant interruption of performance. <br />3. The Contractor could not and did not use resources, including, but not <br />limited to, labor, equipment, materials and tools, standing by or idled <br />on this or other project for any work during the period of Delay; <br />4. The Contractor’s Overhead costs did not materially vary from its usual <br />seasonal Overhead costs during the period of Delay; and <br />5. The Delay did not cause over absorbed Overhead in the period the <br />delayed Work was completed. <br />1-09.11A(4)A1a Resources <br />To demonstrate the Contractor could not and did not use resources, <br />including, but not limited to, labor, equipment, materials and tools from this <br />Project for any other work on this or any other project during the period of <br />Delay in accordance with item 3 of 1-09.11A(4)A1 of these Special <br />Provisions, the Contractor shall: <br />1. Affirmatively represent and warrant that it did not perform <br />substitute work; <br />2. Identify the specific resources that were idled; and <br />3. Show that those resources did not, and could not, work on other <br />contracts or projects during the Delay. <br />1-09.11A(4)A1b No Material Variations <br />To demonstrate the Contractor’s Overhead costs did not materially vary <br />from its usual seasonal Overhead costs during the period of Delay in <br />accordance with item 4 of 1-09.11A(4)A1 of these Special Provisions, the <br />Contractor shall; <br />1. Affirmatively represent and warrant that the completion of the <br />subject Work was extended and that such extension prevented <br />the performance of other work during both the period of Delay <br />and the later period of time required to complete the extended <br />Work, <br />2. Disclose the details of Contractor generated billings and <br />Contractor Overhead Costs, as defined in these Special <br />Provisions, throughout the actual Project performance. The <br />details of such information should be no less than specific <br />identification of the sources and amounts of revenue on no <br />greater than a monthly basis and specific identification of the
The URL can be used to link to this page
Your browser does not support the video tag.