My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-140 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />22. Worksheets, software, and all other documents used by the Contractor to <br />prepare its Bid. The employees or representatives of the City may audit these <br />documents. The Contractor and its Subcontractors shall provide adequate <br />facilities acceptable to the City for the audit during normal business hours. The <br />Contractor and all Subcontractors shall cooperate with the City’s auditors. <br />23. Correspondence, notes, and memoranda. <br />24. Job diaries. <br />25. All documents which relate to each and every claim together with all documents <br />which support the amount of damages as to each claim. <br />1-09.13 Claims Resolution <br />Delete all of 1-09.13 and substitute the following: <br />Prior to seeking claim resolution through litigation, the Contractor shall proceed under <br />the procedures in Sections 1-04.5 and 1-09.11 and elsewhere in the Contract <br />Documents for resolution of disputes. These must be complied with in full, as a condition <br />precedent, to the Contractor’s right to seek claim resolution through litigation. <br />Supplement Section 1-09 by adding the following: <br />1-09.14 Patents and Royalties <br />(******) <br />Should the Contractor, its agent, employee or any of them be enjoined from furnishing or <br />using any invention, article, material or plans supplied or required to be supplied or used <br />under this Contract, Contractor shall promptly pay such royalties and secure requisite <br />licenses; or, subject to acceptance by City, substitute other articles, materials, or appliances <br />in lieu thereof that are of equal efficiency, quality, finish, suitability and market value to those <br />planned or required under the Contract. Descriptive information of these substitutions shall <br />be submitted to the City’s Representative for determination of general conformance to the <br />design concept and the construction Contract. Should City elect to refuse the substitution, <br />Contractor agrees to pay such royalties and secure such valid licenses as may be requisite <br />for the City, its officers, agents and employees or any of them, to use such invention, article, <br />material or appliance without being disturbed or in any way interfered with by any proceeding <br />in law or equity on account thereof. <br />Costs involved in fees, royalties, or claims for any patented invention, article, process, or <br />method that may be used upon or in a manner connected with the Work under this Contract <br />or with use of completed Work by the City shall be paid by the Contractor. The Contractor <br />and its sureties shall protect and hold the City, and City's Representative, together with its <br />officers, agents, and employees, harmless from any and all loss, defense cost, and expenses <br />and against any and all demands made for such fees or claims brought or made by the holder <br />of any invention or patent. Before final payment is made on the account of this Contract, the <br />Contractor shall, if requested by the City, furnish acceptable proof of a proper release from <br />all such fees or claims. <br /> <br />1-10 TEMPORARY TRAFFIC CONTROL <br />1-10.1 General <br />1-10.1(2) Description <br />Supplement 1-10.1(2) as follows: <br />The Contractor shall provide a uniformed off-duty Police Officer to control traffic for <br />work at signalized intersections and other critical situations as determined by the <br />Engineer.
The URL can be used to link to this page
Your browser does not support the video tag.