My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 2 – EARTHWORK October 2025 <br />Work Order No. UP 3814 SP-151 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />For curb and gutter cement removal with concrete pavement, the curb and gutter will be <br />considered as pavement removal and the measurement for payment will be to the back of <br />the curb. <br />2-02.5 Payment <br />Delete all paragraphs in 2-02.5 and substitute the following: <br />Payment for bid items of Work completed pursuant to the Contract Documents will be <br />as described in Division B – Bid Item Descriptions of these Special Provisions and <br />Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />If there is no bid item to cover pavement removals, then they shall be included with the <br />construction of the respective Work including, but not limited to, combined sewer pipe, <br />water main, water service line, manhole, side sewer pipe, storm drainpipe, catch basins, <br />and underground utility vaults. <br />Include curb and gutter and sidewalk removal with construction of the respective Work <br />including, but not limited to, combined sewer pipe, water main, water service line, <br />manhole, side sewer pipe, storm drainpipe, catch basins, and underground utility vaults <br />with no direct compensation made. <br />If there is no pay item for pipe abandonment, then it shall be included with the <br />construction of the respective Work including, but not limited to, sewer or storm <br />drainpipe, water main, manhole, catch basin or side sewer with no direct compensation <br />made. <br />If there is no pay item for existing valve abandonment, then it shall be included with the <br />construction of other items of Work with no direct compensation made. <br /> <br />2-03 ROADWAY EXCAVATION AND EMBANKMENT <br />2-03.1 Description <br />Supplement 2-03.1 by adding the following: <br />This Work applies to street pavement patching and street reconstruction after completion <br />of utility work. Grading for street reconstruction shall conform to COE Standard Drawing <br />No. 302, unless otherwise noted on the Plans. Grading for pavement patching shall <br />conform to COE Standard Drawing No. 326, unless otherwise noted on the Plans. <br />2-03.2 Vacant <br />Revise 2-03.2 as follows: <br />2.03.2 Materials <br />Materials shall meet the requirements of the following: <br />Foundation Material Class A or B 9-03.17 Standard Specifications <br />Gravel Borrow 9-03.14(1) Standard Specifications <br />2-03.3 Construction Requirements <br />Supplement 2-03.3 by adding the following: <br />Blasting is not allowed within the City limits of Everett. <br />Use suitable excavated material for roadway embankments. Dispose of surplus <br />excavated material or unsuitable material in accordance with 2-03.3(7). <br />Engineer will not approve payment for unauthorized excavation or embankment, or both, <br />beyond the limits indicated on the Plans. Return areas of unauthorized excavation or <br />embankment, or both, to their original conditions or better at the Contractor’s expense.
The URL can be used to link to this page
Your browser does not support the video tag.