My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 5 – SURF TREATMTS & PVMTS October 2025 <br />Work Order No. UP 3814 SP-159 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br /> <br />DIVISION 5 – SURFACE TREATMENTS AND PAVEMENTS <br />5-04 HOT MIX ASPHALT <br />Delete 5-04 and substitute the following: <br />5-04.1 Description <br />Work shall consist of providing and placing one or more layers of plant-mixed hot mix asphalt <br />(HMA) on a prepared foundation or base in accordance with these Specifications and the <br />lines, grades, thicknesses, and typical cross-sections shown in the Plans. The manufacture <br />of HMA may include warm mix asphalt (WMA) processes in accordance with these <br />Specifications. WMA processes include organic additives, chemical additives, and foaming. <br />Provide HMA composed of asphalt binder and mineral materials as may be required, mixed <br />in the proportions specified to provide a homogeneous, stable, and workable mixture. <br />5-04.2 Materials <br />Provide materials meeting the requirements of the following sections: <br />Asphalt Binder 9-02.1(4) Standard Specifications <br />Cationic Emulsified Asphalt 9-02.1(6) Standard Specifications <br />Anti-Stripping Additive 9-02.4 Standard Specifications <br />HMA Additive 9-02.5 Standard Specifications <br />Aggregates 9-03.8 Standard Specifications <br />Recycled Asphalt Pavement 9-03.8(3)B Standard Specifications <br />Mineral Filler 9-03.8(5) Standard Specifications <br />Recycled Material 9-03.21 Standard Specifications <br />Portland Cement 9-01 Standard Specifications <br />Sand 9-03.1(2) Standard Specifications <br />(As noted in 5-04.3(5)C for crack sealing) <br />Joint Sealant 9-04.2 Standard Specifications <br />Foam Backer Rod 9-04.2(3)A Standard Specifications <br />The Contractor may use up to 20 percent RAP by total weight of HMA with no additional <br />sampling or testing of the RAP. Sample and test the RAP at a frequency of one sample for <br />every 1,000 tons produced and not less than two samples per project. Report the asphalt <br />content and gradation test data to the City when submitting the mix design for approval on <br />the QPL. Include the RAP as part of the mix design as defined in these Specifications. <br />Provide the grade of asphalt binder as required by the Contract. Blending of asphalt binder <br />from different sources is not permitted. <br />The Contractor may only use warm mix asphalt (WMA) processes in the production of HMA <br />with 20 percent or less RAP by total weight of HMA. Submit to the Engineer for approval the <br />process that is proposed and how it will be used in the manufacture of HMA. <br />For production of aggregates comply with the requirements of Section 3-01. <br />For preparation of stockpile site, the stockpiling of aggregates, and the removal of aggregates <br />from stockpiles comply with the requirements of Section 3-02. <br />5-04.2(1) How to Get an HMA Mix Design on the QPL <br />If the contractor wishes to submit a mix design for inclusion in the Qualified Products <br />List (QPL), please follow the WSDOT process outlined in Standard Specification 5- <br />04.2(1).