Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 5 – SURF TREATMTS & PVMTS October 2025 <br />Work Order No. UP 3814 SP-161 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />5-04.2(2)B Using Warm Mix Asphalt Process <br />The Contractor may elect to use additives that reduce the optimum mixing <br />temperature or serve as a compaction aid for producing HMA. Additives include <br />organic additives, chemical additives, and foaming processes. The use of Additives <br />is subject to the following: <br />a. Do not use additives that reduce the mixing temperature more than allowed <br />in Section 5-04.3(6) in the production of mixtures. <br />b. Before using additives, obtain the Engineer’s approval using WSDOT Form <br />350-076 to describe the proposed additive and process. <br />5-04.3 Construction Requirements <br />5-04.3(1) Weather Limitations <br />Do not place HMA for wearing course on any Traveled Way beginning October 1st <br />through March 31st of the following year without written concurrence from the Engineer. <br />Do not place HMA on any wet surface, or when the average surface temperatures are <br />less than those specified in Table 1, or when weather conditions otherwise prevent the <br />proper handling or finishing of the HMA. <br />Table 1 – Minimum Surface Temperature for Paving <br />Compacted Thickness (Feet) Wearing Course Other Courses <br />Less than 0.10 55°F 45°F <br />0.10 to .20 45°F 35°F <br />More than 0.20 35°F 35°F <br /> <br />5-04.3(2) Paving Under Traffic <br />Apply the requirements of this Section when the Roadway being paved is open to traffic. <br />Keep intersections open to traffic at all times, except; when paving the intersection or <br />paving across the intersection. During such time, and provided that there has been an <br />advance warning to the public, the intersection may be closed for the minimum time <br />required to place and compact the mixture. In hot weather, the Engineer may require the <br />application of water to the pavement to accelerate the finish rolling of the pavement and <br />to shorten the time required before reopening to traffic. <br />Before closing an intersection, place advance warning signs and signs marking the <br />detour or alternate route. <br />During paving operations, maintain temporary pavement markings throughout the <br />project. Install temporary pavement markings on the Roadway prior to opening to traffic. <br />Provide temporary pavement markings in accordance with Section 8-23. <br />Include all costs in connection with performing the Work in accordance with these <br />requirements, except the cost of temporary pavement markings, in the unit Contract <br />prices for the various Bid items involved in the Contract. <br />5-04.3(3) Equipment <br />5-04.3(3)A Mixing Plant <br />Provide plants used for the preparation of HMA conforming to the following <br />requirements: <br />1. Equipment for Preparation of Asphalt Binder – Equip tanks for the storage <br />of asphalt binder to heat and hold the material at the required temperatures. <br />Accomplish the heating by steam coils, electricity, or other approved means so