My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div P – PROPOSAL October 2025 <br />Work Order No. UP 3814 SP-15 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br /> <br />BID DEPOSIT <br /> <br />Bidder herewith guarantees its Bid by depositing one of the following with its Proposal in an amount of <br />five percent (5%) or more of the Bidder’s total Bid: <br /> <br /> Certified check <br /> Cashier’s check <br /> Bid Bond <br /> <br /> _____________________________________ <br /> Signature <br /> <br /> <br /> <br /> <br />BID BOND <br /> <br />Bond No. ____________ <br />Project: Water Main Replacement “Y” – Phase 2 <br />Work Order No. UP 3814 <br /> <br /> <br />KNOW ALL MEN BY THESE PRESENTS, <br />that __________________________________________ [Contractor], a corporation <br />organized under the laws of the State of ______________, and registered to do business <br />in the State of Washington as a contractor, as Principal, and <br />_______________________________________________________[Surety], a <br />corporation organized under the laws of the State of ____________ and registered to <br />transact business in the State of Washington, as Surety, their heirs, executors, <br />administrators, successors and assigns, are jointly and severally held and bound to the <br />City of Everett, Washington, hereinafter called “City,” and are similarly held and bound <br />unto the City in the sum of ________________________ and __/100’s Dollars <br />($_____________), the payment of which, well and truly to be paid, we bind ourselves, <br />our heirs, executors and successors, jointly and severally, formally by these presents. NOW, THEREFORE, the condition of this obligation is such that the Surety is held and bound to the City to pay and forfeit to the City the amount of this bond as provided herein, upon the conditions contained herein, unless the conditions for release contained herein are satisfied or expressly waived in a writing signed by the City Attorney. <br /> <br />It is expressly understood and agreed that: <br /> <br />1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, <br />successors and assigns to pay to the City upon default of Bidder the penal sum set forth on the face of <br />this Bond.
The URL can be used to link to this page
Your browser does not support the video tag.