Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br />Water Main Replacement “Y” – Ph 2 Div B – BID ITEM DESCRIPTIONS <br />Work Order No. UP 3814 SP-19 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />DIVISION B – BID ITEM DESCRIPTIONS <br /> Mobilization <br />Specification Section 1-09 <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid for mobilization shall constitute complete compensation for all of Contractor’s <br />preconstruction costs of preparatory work and operations including, but not limited to, those <br />necessary for the movement of the Contractor’s personnel, equipment, supplies and incidentals to <br />the Project; for the establishment of its offices, buildings and other facilities necessary for Work on <br />this Project; for premiums on bonds and insurance for the Project, and for Work and operations <br />that the Contractor must perform or costs it must incur before beginning production work on the <br />various items on the Project. Mobilization also includes, but is not limited to, posting construction <br />identification signs, securing permits, establishing safety and security measures, preparing a traffic <br />control plan(s), preconstruction photographs, developing a Schedule of Values for lump sum bid <br />items, submitting the project schedule and providing product and material submittals, and posting <br />of notices and jobsite posters as required by WSDOT 1-07.9(2). Also include mobilization costs for <br />all subcontracted work along with all costs for utility coordination noted on the Plans and in the <br />Specifications. All costs for maintaining and restoring City provided lay-down areas to existing <br />conditions are included in this bid item. <br />Items not included in this item include, but are not limited to: <br />(a)Work covered by a specific bid item or Work that is to be included in a bid item or items. <br />(b)Profit, interest on borrowed money, overhead or management costs. <br />Partial payments will be made for the lump sum contract price for “Mobilization” as follows: <br />(a)When 5% of the total original contract amount is earned from other bid items, 50% of the <br />amount bid for mobilization, or 5% of the total original contract amount, whichever is the <br />least, will be paid. <br />(b)When 10% of the total original contract amount is earned from other bid items. 100% of the <br />amount bid for mobilization, or 10% of the total contract amount, whichever is the least, will <br />be paid. <br />Upon substantial completion, payment of any amount bid for mobilization in excess of 10% of the <br />total original contract amount will be paid. <br /> Surveying <br />Specification Section 1-05 <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid for surveying includes, but is not limited to, all costs associated with furnishing <br />all labor, tools, survey instruments materials, and other equipment necessary for the setting and <br />monitoring the location, elevation, alignment and grade of the Work as specified in 1-05.4 <br />CONFORMITY WITH AND DEVIATIONS FROM PLANS AND STAKES and the Plans. <br />The lump sum bid item also includes, but is not limited to, all costs associated with furnishing all <br />labor, tools, survey instruments, materials, and other equipment necessary for verifying the rim and <br />invert elevations, prior to construction, of all existing manholes and pipes where connections are <br />to be made. <br />The lump sum also includes, but is not limited to, all costs associated with furnishing all labor, tools, <br />survey instruments, materials and other equipment necessary for obtaining the “as constructed” <br />location and elevations of the Work, in particular, sewer pipe invert elevations and other information <br />October 2025