My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Water Main Replacement “Y” – Ph 2 Div B – BID ITEM DESCRIPTIONS <br />Work Order No. UP 3814 SP-31 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br /> Crushed Surfacing Top Course <br />Specification Section 4-04 <br />Measurement and Payment: Unit Price per Ton (TON) <br />Measurement for crushed surfacing top course will be by the ton as recorded on certified weight <br />tickets in accordance with 1-09.2 WEIGHING EQUIPMENT and limited to dimensions defined in <br />the Work, descriptions for other bid items, shown on the Plans, details or COE Standard Drawings <br />or as otherwise approved by the Engineer. Crushed Surfacing Top Course material placed <br />exceeding “neatline” limits without advance authorization by the Inspector will not be paid for. <br />The unit price per ton shall be full compensation for all labor, compaction, material, tools, and <br />equipment necessary to furnish, haul, stockpile, place, grade, and compact imported crushed <br />surfacing top course for the Work as required, from a Contractor supplied source in accordance <br />with the Standard Specifications and these Special Provisions. <br />The unit price for crushed surfacing top course also includes all costs for controlling moisture <br />content. <br />Also included in this bid item shall be the cost of all equipment required to remove existing soils to <br />attain proper elevations, compaction of native subgrade soils, as well as to uniformly spread and <br />compact the crushed surfacing material. <br />The unit price for this bid item includes all costs for removing, loading, and disposing of displaced <br />unsuitable material, including haul. <br />Include in this bid item the cost of sprinkling during dry periods prior to placement of the crushed <br />surfacing and while spreading and compacting the material. <br />Payment for crushed surfacing top course will be by the ton for permanent trench patch, and <br />material placed and approved by the Inspector. <br /> HMA, CL 1/2” PG 64-22 for Permanent Trench Patch <br />Specification Section 5-04 <br />Measurement and Payment: Unit Price per Ton (TON) <br />Measurement for HMA, CL 1/2” PG 64-22 shall be by the ton, recorded on certified weight tickets <br />in accordance with 1-09.2 WEIGHING EQUIPMENT for HMA placed within the limits of dimensions <br />defined in the Work or shown on the Plans, Standard Specifications, Section 5-06 of these Special <br />Provisions, or as otherwise approved by the Engineer. The measurement and payment limits for <br />measuring the width of this bid item shall not exceed the saw-cut limits shown on the Drawings. No <br />deduction will be made for the weight of asphalt binder, blending sand, mineral filler, or other <br />component of the mixture. <br />The unit price for this bid item shall include all labor, materials, equipment and related work <br />necessary to furnish, machine-place, compact, roll and perform density tests on multiple lifts of <br />HMA – CL 1/2 ” PG 64-22 pavement including streets, alleys, street crossings, and driveway aprons <br />as shown on the Plans. <br />Miscellaneous HMA used for pavement repair, thickened edges, extruded and wedge curbing, <br />placing, and compacting pre-leveling, leveling and wearing courses, feathering pavement is <br />included in this bid item with no direct compensation made. <br />Furnishing and applying tack coat, prime coat, joint seal and crack sealing asphalt is to be included <br />in this bid item with no direct compensation made. All costs for “Anti Stripping Additive” and <br />“Compaction Adjustment” shall be included in the unit contract price per ton of the HMA with no <br />direct compensation made. <br />October 2025
The URL can be used to link to this page
Your browser does not support the video tag.