My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-41 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br /> <br />DIVISION 1 – GENERAL REQUIREMENTS <br />Supplement Division 1 by adding the following: <br />General Description and Location of Project <br />(******) <br />Work being performed includes furnishing all labor, materials and equipment necessary to <br />construct approximately 1,020 linear feet of 12-inch ductile iron watermain and <br />appurtenances, including relocation of an existing PRV station, site restoration, installation <br />on existing I-5 bridge structure over the Snohomish River and BNSF Railroad, and removal <br />and disposal of the existing 8-inch waterline on the I-5 bridge and performing all Work as <br />required by the Contract, in accordance with the Contract Plans and Contract Provisions. <br />The Project is in Everett, Washington, and the southern project limit is located on E Grand <br />Ave/E Marine View Dr between the I-5 southbound on-ramp and I-5 northbound off-ramp. <br />The northern project limit is located at the intersection of Smith Island Road and 4th St SE <br />near the Everett Wastewater Treatment Plant. <br />Apprentice Utilization <br />This Project requires apprentice utilization as set forth below in Special Provision 1-7.9(3). <br />Design Engineer <br />(******) <br />Questions and inquiries about these Contract Documents should be directed in writing to the <br />attention of Amie Campbell, P.E. City Project Manager, acampbell@everettwa.gov. <br />Standard Specifications <br />(******) <br />All Work under this Contract shall be performed in accordance with the following <br />Specifications except as may be exempted or modified by other sections of these Contract <br />Documents. These Specifications are incorporated by reference, made a part of this <br />Contract, and shall control and guide all activities within this Project whether referred to <br />directly, paragraph by paragraph. <br />WSDOT/APWA “2023 Standard Specifications for Road, Bridge and Municipal <br />Construction,” hereinafter referred to as the “Standard Specifications.” <br />The Standard Specifications, as modified or supplemented by these Special Provisions, all <br />of which are made a part of the Contract Documents, shall govern all of the Work. The <br />following latest edition of other specifications and standard plans shall apply to the extent to <br />which they are called out in the Contract Documents: <br />1. City of Everett “Design and Construction Standards and Specifications,” latest edition <br />as found on the Web at “http://www.everettwa.gov/1531/Design-Construction- <br />Standards.” <br />2. “Standard Plans for Road and Bridge Construction,” as prepared by WSDOT. <br />3. “Manual on Uniform Traffic Control Devices (MUTCD).” <br />4. APWA Standards. <br />5. AWWA Standards. <br />Each Provision of these Special Provisions either supplements, modifies, or replaces the <br />comparable Standard Specification, or is a new Provision. The deletion, amendment, <br />alteration, or addition to any subsection or portion of the Standard Specifications is meant to
The URL can be used to link to this page
Your browser does not support the video tag.