Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-41 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br /> <br />DIVISION 1 – GENERAL REQUIREMENTS <br />Supplement Division 1 by adding the following: <br />General Description and Location of Project <br />(******) <br />Work being performed includes furnishing all labor, materials and equipment necessary to <br />construct approximately 1,020 linear feet of 12-inch ductile iron watermain and <br />appurtenances, including relocation of an existing PRV station, site restoration, installation <br />on existing I-5 bridge structure over the Snohomish River and BNSF Railroad, and removal <br />and disposal of the existing 8-inch waterline on the I-5 bridge and performing all Work as <br />required by the Contract, in accordance with the Contract Plans and Contract Provisions. <br />The Project is in Everett, Washington, and the southern project limit is located on E Grand <br />Ave/E Marine View Dr between the I-5 southbound on-ramp and I-5 northbound off-ramp. <br />The northern project limit is located at the intersection of Smith Island Road and 4th St SE <br />near the Everett Wastewater Treatment Plant. <br />Apprentice Utilization <br />This Project requires apprentice utilization as set forth below in Special Provision 1-7.9(3). <br />Design Engineer <br />(******) <br />Questions and inquiries about these Contract Documents should be directed in writing to the <br />attention of Amie Campbell, P.E. City Project Manager, acampbell@everettwa.gov. <br />Standard Specifications <br />(******) <br />All Work under this Contract shall be performed in accordance with the following <br />Specifications except as may be exempted or modified by other sections of these Contract <br />Documents. These Specifications are incorporated by reference, made a part of this <br />Contract, and shall control and guide all activities within this Project whether referred to <br />directly, paragraph by paragraph. <br />WSDOT/APWA “2023 Standard Specifications for Road, Bridge and Municipal <br />Construction,” hereinafter referred to as the “Standard Specifications.” <br />The Standard Specifications, as modified or supplemented by these Special Provisions, all <br />of which are made a part of the Contract Documents, shall govern all of the Work. The <br />following latest edition of other specifications and standard plans shall apply to the extent to <br />which they are called out in the Contract Documents: <br />1. City of Everett “Design and Construction Standards and Specifications,” latest edition <br />as found on the Web at “http://www.everettwa.gov/1531/Design-Construction- <br />Standards.” <br />2. “Standard Plans for Road and Bridge Construction,” as prepared by WSDOT. <br />3. “Manual on Uniform Traffic Control Devices (MUTCD).” <br />4. APWA Standards. <br />5. AWWA Standards. <br />Each Provision of these Special Provisions either supplements, modifies, or replaces the <br />comparable Standard Specification, or is a new Provision. The deletion, amendment, <br />alteration, or addition to any subsection or portion of the Standard Specifications is meant to