My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction Inc. 12/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 10:39:10 AM
Creation date
12/17/2025 10:24:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/17/2025
Council Approval Date
12/10/2025
Department
Public Works
Department Project Manager
Amie Campbell
Subject / Project Title
Water Main Y, Phase 2
Tracking Number
0005048
Total Compensation
$2,020,202.02
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 2 Div 1 – GEN REQUIREMENTS October 2025 <br />Work Order No. UP 3814 SP-81 <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />The City advises all general contractors and subcontractors that numerous Federal, <br />State, and Local regulations exist that could affect the procedures used in the completion <br />of this project. The City advises each prospective Contractor that they are responsible <br />to be aware of and comply with all applicable statutes and regulations. It is <br />recommended that each Contractor contact the local office of the following agencies for <br />a list of applicable regulations and requirements that might affect the implementation of <br />this project: <br />• Federal Environmental Protection Agency <br />• Washington Department of Health <br />• Washington Department of Ecology <br />• Washington Department of Fisheries <br />• Washington Department of Wildlife <br />• Washington Department of Labor & Industries <br />• Puget Sound Air Pollution Control Agency <br />• Municipal Building Department <br />• Municipal Planning Department <br />• Municipal Public Works Department <br />If the scope of Work in this Contract includes Work at the City of Everett Water Filtration <br />Plant or the Waste Water Pollution Control Facility, Contractor shall comply with the <br />requirements of the Washington Department of Labor & Industries for such work <br />including, but not limited to, Chapter 296-67 WAC. All costs associated or incurred in <br />complying with these regulations or any other regulations listed above are included in <br />the Contractor’s Proposal. <br />In cases of conflict between different safety regulations, the more stringent regulation <br />shall apply. <br />The Washington State Department of Labor and Industries shall be the sole and <br />paramount administrative agency responsible for the administration of the provisions of <br />the Washington Industrial Safety and Health Act of 1973 (WISHA). <br />The Contractor shall maintain at the project site office, or other well-known place at the <br />project site, all articles necessary for providing first aid to the injured. The Contractor <br />shall establish, publish, and make known to all employees, procedures for ensuring <br />immediate removal to a hospital, or doctor’s care, persons, including employees, who <br />may have been injured on the project site. Employees should not be permitted to work <br />on the project site before the Contractor has established and made known procedures <br />for removal of injured persons to a hospital or a doctor’s care. <br />The Contractor shall have sole responsibility for the safety, efficiency, and adequacy of <br />the Contractor’s plant, appliances, and methods, and for any damage or injury resulting <br />from their failure, or improper maintenance, use, or operation. The Contractor shall be <br />solely and completely responsible for the conditions of the project site, including safety <br />for all persons and property in the performance of the Work. This requirement shall apply <br />continuously, and not be limited to normal working hours. The required or implied duty <br />of the Engineer to conduct construction review of the Contractor’s performance does <br />not, and shall not, be intended to include review and adequacy of the Contractor’s safety <br />measures in, on, or near the project site. <br />1-07.1(7) Noise <br />Work within 500 feet of residential properties between the hours of 10:00 p.m. and 7:00 <br />a.m. during weekdays and between the hours of 6:00 p.m. and 8:00 a.m. on weekends <br />or holidays are subject to noise control requirements if the work generates decibel levels
The URL can be used to link to this page
Your browser does not support the video tag.