My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-26 2026-01-16
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-26
>
3003 W CASINO RD BLDG 40-26 2026-01-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2026 10:17:28 AM
Creation date
12/22/2025 11:20:20 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-26
Permit
M2407-078
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEUD ORFER � <br /> ENGINEERS N F.r� <br /> WVVW.NEUDORFERENGINEERS.COM <br /> AN Integra COMPANY <br /> PROJECT Boeing Bldg 40-26 737 Noth Line Tower Relocation 2024-0419 <br /> LOCATION Everett, WA <br /> EXECUTIVE SUMMARY <br /> This project has been balanced per plans and specifications using the National Environmental <br /> Balancing Bureau (NEBB) standards and procedures. <br /> The fans have been checked for unit data, operating amperage, voltage, rotation, and operating static <br /> pressure. All outlets have been proportioned to ± 10% of design airflow unless otherwise noted. <br /> Balancing diagrams are attached to this report with outlets numbered for locations. <br /> Equipment: Shortridge 870C ADM Multimeter, Shortridge Hydrometer <br /> Results: <br /> HVAC-25 <br /> HVAC-25 is an air handling unit that serves Shim Shop 101 P3. The unit had previously had ductwork <br /> demoed in a previous phase and is to be rebalanced to specified settings and airflows. HVAC-25 <br /> operates as a constant volume air handling unit. The airflows were measured by pitot tube duct <br /> traverse at the return air/ outside air intakes and supply air discharge. Speed settings and damper <br /> positions were derived from airflow measurements. See test data below. <br /> HVAC-25 Cooling Coil Valve <br /> HVAC-25 is equipped with a cooling coil to condition airflow into the machine shop. The mechanical <br /> drawings call for the valve to be balanced from the original 46 GPM to 29.1 GPM. A Griswold autoflow <br /> valve is installed- the water flow rate could not be adjusted. With the cooling coil active, the pressure <br /> drop was within the operating range of the valve (2-32 PSI). The total water flow was confirmed to be <br /> 46 GPM. See test data below. <br /> NATIONAL ENVIRONMENTAL BALANCING BUREAU <br />
The URL can be used to link to this page
Your browser does not support the video tag.