Eintegra <br /> NEUDORFER <br /> ENGINEERS <br /> AN Integra COMPANY <br /> Air Handling Unit <br /> PROJECT: Boeing 40-26 Tower Relocation DATE: 3/3/2025 <br /> LOCATION: Everett,WA CONTACT: Tony Amort <br /> PROJECT#: 2024-0419 AUTHOR: <br /> SYSTEM/UNIT: HVAC-25 Tested By: Tony Amort <br /> AREA: Shim Shop 101 P3 Date: 2/25/2025 <br /> Sheave Data <br /> HVAC-25/Supply Fan <br /> Sheave Center Line 27 in. <br /> Motor to Extend 3 in. <br /> Motor to Retract 1 in. <br /> Test Pressures <br /> CA Damper Pos 60% <br /> RA Damper Pos 40% <br /> Log: HVAC-25 3/3/2025 Tony Amort (1)The volume damper is full open. <br /> HVAC-25 3/3/2025 Tony Amort (2)The balancing damper is located above TA510MT <br /> 3-Axis CNC Machine and could not be accessed to <br /> throttle airflow. <br /> HVAC-25 3/3/2025 Tony Amort The amps and volts were recorded from the VFD. <br /> SYSTEM/UNIT: HVAC-25/Return Fan Static Pressure Tested By: Tony Amort <br /> Profile Date: 3/3/2025 <br /> Test Pressures <br /> Return Fan SP In -0.14 in.w.c. <br /> Return Fan SP Out 0.01 in.w.c. <br /> Static Pressure Profile <br /> 1 <br /> RF <br /> J; <br /> Neudorfer Engineers <br />