Laserfiche WebLink
Eintegra <br /> NEUDORFER <br /> ENGINEERS <br /> AN Integra COMPANY <br /> Hydronic Pump <br /> PROJECT: Boeing 40-26 Tower Relocation DATE: 3/3/2025 <br /> LOCATION: Everett,WA CONTACT: Tony Amort <br /> PROJECT#: 2024-0419 AUTHOR: <br /> SYSTEM/UNIT: Existing Chill Water System Tested By: Tony Annort <br /> Date: 2/25/2025 <br /> Log: Existing Chill Water System 2/25/2025 Tony Amort The chill water system controls to a loop pressure <br /> set point of 75 PSI. <br /> Existing Chill Water System Autoflow Valve Summary <br /> System/Unit Manufacturer Model Number Valve Valve Design Actual Design Actual %of <br /> Size Position D.P. D.P. Flow Flow Desi n <br /> Autoflow Valve- Griswold Not Legible 2" 2-32 4.00 29.10 46.00 158 <br /> 01 <br /> Totals: - - - - 29.10 46.00 158 <br /> Neudot-fer Engineers <br />